Laserfiche WebLink
Newmont Mining Corporation <br /> Cripple Creek&Victor Gold Mine ■ <br /> Squaw Gulch VLF CQA <br /> NewFields Job No.475.0106.006 <br /> Week Ending Saturday,May 21,2016 <br /> 5.0 MEETINGS AND COMMUNICATIONS <br /> NewFields personnel attended the weekly Contractor Planning Meeting (May 17 2016), weekly <br /> Contractor Safety Meeting (May 19, 2016), Ames daily safety meetings and NewFields daily <br /> safety meetings. <br /> 6.0 MISCELLANEOUS, ISSUES AND CONCERNS <br /> Ames installed the geocell wildlife ramps at the underdrain ponds. An anchor trench was <br /> excavated at the pond crest to secure the geomembrane wearsheet and the geocell anchor. <br /> The geocell was installed along the slope and bottom of the pond and tack welded to the <br /> geomembrane wearsheet to secure it in place. The geocell was then backfilled with gravel. <br /> 7.0 PHOTOGRAPHS <br /> t a-dy - .i0 ode <br /> l -"i t"fi-, <br /> 4 <br /> 41nb4.r <br /> f <br /> r <br /> May 16, 2016— Nondestructive Testing on Phase 1 Geomembrane Repairs (BM) <br /> Page 4 <br />