Laserfiche WebLink
Page 1 of 2 <br /> WHEEL LOADER—LOAD AND CARRY WORK <br /> Task description: Rough Grade to 3H: IV <br /> Site: CDR Pit Permit Action: 2016 U date Permit/Job#: M2006059 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado _ Abbreviation: None <br /> Date: 5/11/2016 County: Archuleta Filename: M059-001 <br /> User: LJW <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: CAT 446D Horsepower: 101 <br /> Attachment 1: ROPS Cab Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $17.48 NA <br /> Operating Cost/Hour: $25.04 100 <br /> Operator Cost/Hour: $38.60 NA <br /> Total Unit Cost/Hour: $81.12 <br /> Total Fleet Cost/Hour: $81.12 <br /> MATERIAL QUANTITIES <br /> Initial volume: 2,420 MY Swell factor: 1.000 <br /> Loose volume: 2,420 LCY <br /> Source of estimated volume: Division of Reclamation, Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Loader Cycle Time: Unadjusted Basic Cycle Time(load,dump, 0.475 minutes <br /> maneuver): <br /> Cycle Time Factors Factor min.) Source <br /> Material: Material 3/4"to 6"diameter 0.00 0.000 (Cat HB) <br /> Stockpile: Conveyor or dozer piled 10 ft.high and up 0.000 (Cat HB) <br /> 0.00 <br /> Truck Ownership: Common ownership of trucks and loaders- -0.040 (Cat HB) <br /> 0.04 <br /> Operation: Constant operation-0.04 -0.040 (Cat HB <br /> Dump Target: No adjustment-factor not a: :?licable 0.00 0.000 (Cat HB <br /> Net Cycle Time Adjustment: -0.080 minutes <br /> Adjusted Basic Cycle Time: 0.395 minutes <br /> Rolling Resistance-Road Conditions <br /> Haul: Loose sand or gravel 10 <br /> Return: Loose sand or gravel 10 <br /> Haul and Return Time <br /> CIRCES Cost Estimating Software <br />