Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Cost Summary <br /> Site: CDR Pit Permit Action: 2016 Update Penmit/Job#: M2006059 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 5/11/2016 County: Archuleta Filename: M059-000 <br /> User: LJW <br /> Agency or organization name: DBMS <br /> TASK LIST (DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Rough Grade to 3H: 1V LOADER 1 16.91 $1,372.00 <br /> 002 Replace Topsoil 6"deep over 3 acres of disturved LOADER 1 17.93 $1,455.00 <br /> land <br /> 003 Reve etation of 3 acres affected lands RENEGE 1 0.00 $4,131.00 <br /> 004 Mobilize to and from job site MOBILIZE 1 4.40 $1,963.00 <br /> SUBTOTALS: 39.24 $8,921 <br /> INDMECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $180.20 <br /> Performance bond: 1.05 Total $93.67 <br /> Job superintendent: 19.62 Total = $1,461.30 <br /> Profit: 10.00 Total— $892.10 <br /> TOTAL O&P= $2,627.27 <br /> CONTRACT AMOUNT(direct+O&P)_ $11,548.27 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): 500.00 Total= 500.00 <br /> Engineering work and/or contract/bid preparation: 0.00 Total= $0.00 <br /> Reclamation management and/or administration: 0.00 $0.00 <br /> CONTINGENCY: 0.00 Total= $0.00 <br /> TOTAL INDIRECT COST= $3,127.27 <br /> TOTAL BOND AMOUNT(direct+indirect)= $12,048.27 <br />