Laserfiche WebLink
Pagel of 3 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: Haul topsoil from borrow pit to terraces <br /> Site: Flag Creek Mine Permit Action: SI-2 Permit/Job#: M1997098 <br /> PROJECT IDENTIFICATION <br /> Task#: 03A State: Colorado Abbreviation: None <br /> Date: 5/9/2016 County: Rio Blanco Filename: M098-03a <br /> User: THM <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: Generic 10-12 cy,6x4 <br /> -Loader: h CAT 966H <br /> Support Equipment-Load Area: Cat 138T-8SU T <br /> -Dump Area: Cat D8T-8SU <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Truck/Loader Team Support E ui ment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 100 100 100 NA NA <br /> Ownership cost/hour: $12.83 $31.06 $66.85 $66.85 NA NA <br /> Operating cost/hour: $54.86 $57.24 $102.51 $102.51 NA NA <br /> Ripper op.cost/hour: NA $0.00 $0.00 $0.00 NA NA <br /> Operator cost/hour: $0.00 $38.60 $38.89 $38.89 NA NA <br /> Unit Subtotals: $67.69 $126.90 $208.25 $208.25 NA NA <br /> Number of Units: 2 1 1 1 0 0 <br /> Group Subtotals: Work: $262.28 Support: $416.50 Maint: $0.00 <br /> Total work team cost/hour: $678.78 <br /> MATERIAL QUANTITIES <br /> Initial volume: 8,448 CCY Swell factor: 1.215 <br /> Loose volume: 10,264 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity: <br /> Truck Payload(weight)Basis: <br /> Material weight: 1,600 Pounds/LCY <br /> Description: Top Soil <br /> Rated Payload: 35,400 Pounds <br /> Payload Capacity: 22.13 LCY <br /> CIRCES Cost Estimating Software <br />