My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-09_REVISION - M1997098
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997098
>
2016-05-09_REVISION - M1997098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:34 AM
Creation date
5/10/2016 9:19:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997098
IBM Index Class Name
Revision
Doc Date
5/9/2016
Doc Name
Surety Increase 2
From
DRMS
To
Flat Top Flagstone
Type & Sequence
SI2
Email Name
THM
BJC
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORE <br /> Task description: Rip 7.68 acres of terrace <br /> Site: Flag Creek Mine Permit Action: SI-2 Permit/Job#: M1997098 <br /> PROJECT IDENTIFICATION <br /> Task#: 02A State: Colorado Abbreviation: None <br /> Date: 5/9/2016 County: Rio Blanco Filename: M098-02a <br /> User: THM <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU Horsepower: 310 <br /> Ripper Attachment: 1-Shan_k Ripper Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization°o <br /> Ownership Cost/Hour: $74.27 NA <br /> Operating Cost/Hour: $102.51 100 <br /> Ripper Operating Cost/Hour: $9.46 100 <br /> Operator Cost/Hour: $38.89 NA <br /> Total Unit Cost/Hour: $225.13 <br /> Total Fleet Cost/Hour: $225.13 <br /> MATERIAL QUANTITIES Selected estimating method: Area <br /> Alternate Methods: <br /> Seismic: NA Bank Volume: NA BCY NA <br /> Area: 7.68 acres Rip Depth(ft): 2.00 Volume: 24,781 BCY or CCY <br /> Source of estimated quantity: Staff Estimate <br /> HOURLY PRODUCTION <br /> Seismic: <br /> Seismic Velocity: NA feet/second <br /> Area: <br /> Average Ripping Depth: 1.00 mph <br /> Average Ripping Width: 5.56 degrees <br /> Average Ripping Length: 50.00 feet <br /> Average Dozer Speed: 88.00 feet <br /> Average Maneuver Time: 0.25 feet <br /> Production per unit area: 0.468 acres/hour <br /> Job Condition Correction Factors <br /> Unadjusted Hourly Unit Production: 0.468 Acres/hr <br /> Site Altitude: 8,200 feet <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.83 multiplier <br /> Adjusted Hourly Unit Production: 0.39 Acres/hr <br /> Adjusted Hourly Fleet Production: 0.39 Acres/hr <br /> JOB TIlVIE AND COST <br /> Fleet size: 1 Grader(s) Total job time: 19.77 Hours <br /> Unit cost: $579.558 Per acre Total job cost: $4,451 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.