Laserfiche WebLink
David McHugh <br /> Page 12 <br /> May 5, 2016 <br /> 4. Section N: Operation and Reclamation Measures of the application references a trail which <br /> connects to the mine entrance. The application also references a historic road(561 feet) <br /> which will be used to access the mine. Are the trail and historic road one and the same, or are <br /> they different features which can be used to access the mine? <br /> 5. The Applicant has stated that 2 liters of fuel will be stored on-site. Please commit to storing <br /> the fuel within secondary containment which can hold 110%of the total volume of fuel. <br /> Be advised that if these items have not been addressed within 60 days of the date of this letter <br /> (July 5, 2016), the Division may terminate the NOI application in accordance with Rule 5.1.3(c) <br /> of the Hard Rock Rules. Please remember to designate as appropriate those materials in the <br /> application that you desire to be made confidential versus those to be made public. <br /> If you have any questions, you may contact me at (303)866-3567 x8116. <br /> Sincerely, <br /> IA &Lt_ <br /> Michael A. Cunni gham <br /> Environmental Protection Specialist <br /> CC: Wally Erickson, DRMS <br />