Laserfiche WebLink
SECTIONT WO General Personnel Information <br /> Successful operation and maintenance of Mayflower TSF and 5 Dam(impoundment slope and <br /> tailing beach)requires a quality-oriented,well-trained staff. Presented below are guidelines <br /> and/or requirements for staff responsibilities and general information about site safety, <br /> environmental practices and regulatory agencies and oversight. <br /> 2.1 DOCUMENT DISTRIBUTION <br /> The O&M manual is a controlled document intended for internal use only. As such,a limited <br /> number of copies are available for use. Future copies may be developed and the distribution <br /> added to the list below. The following entities will maintain a copy of the O&M manual: <br /> • Climax Mill Engineering Office. <br /> • Climax Tailing Operations Office. <br /> • Climax Environmental Department Office. <br /> • URS Office, Denver, Colorado. <br /> • Colorado Division of Reclamation,Mining, and Safety(DRMS). <br /> • Wheeler Office,Englewood,Colorado. <br /> Updates and revisions to the O&M manual will be coordinated through the Climax Mill <br /> Engineering Office so that all copies reflect the changes and they remain identical. <br /> 2.2 ROLES AND RESPONSIBILITIES <br /> It is the responsibility of every Climax employee to perform his or her assignment in a manner <br /> that promotes safety,protects the environment, and is consistent with established responsibilities. <br /> The following personnel are responsible for managing, operating, and maintaining the Climax <br /> tailing dams and appurtenances. <br /> Tailing Operations <br /> Tailing Supervisor—Reed Bennetts (719) 486-7559 <br /> Services Superintendent—Gordon Stinnett(719)486-7616 <br /> Mill Manager—Mark Mansuetti (719) 486-7588 <br /> Tailing& Water(Area 500) Engineering <br /> Tailing Engineer—Tyson Parrott(719)486-7566 <br /> Senior Engineer—Tom Brown(719)486-7635 <br /> Chief Engineer—Ron Valentine(719)486-7565 <br /> Day-to-day operation of Mayflower TSF is the responsibility of the tailing operators. Currently <br /> the operation of the dam is to be performed by four operators under supervision by the Services <br /> Superintendent. The quantity of designated staff will vary with operational requirements. <br /> Climax will continually evaluate staffing needs for tailing deposition and dam operation. <br /> URSC:\USERSWS912MAPPDATAILOCALVAICROSOFTWJINDOWSI EXPLOREFATEMPORARY INTERNET FILESICONTENT.OUTLOOKL1355FSROIMAYFLOWER OM PLAN_FINAL.DOCX 2-1 <br />