Laserfiche WebLink
Newmont Mining Corporation <br /> Cripple Creek&Victor Gold Mine ■ <br /> Squaw Gulch VLF CQA <br /> NewFields Job No.475.0106.006 <br /> Week Ending Saturday,April 16,2016 <br /> 5.0 MEETINGS AND COMMUNICATIONS <br /> NewFields personnel attended the weekly Contractor Planning Meeting (April 12, 2016), Ames <br /> daily safety meetings, Weekly Contractor Safety Meeting (April 14, 2016) and NewFields daily <br /> safety meetings. <br /> 6.0 MISCELLANEOUS, ISSUES AND CONCERNS <br /> An existing 12-inch HDPE (DR11) barren line was trenched into the ore access road on the high <br /> grade mill slope. The trench was excavated to the top of the existing drain cover fill. Three feet <br /> of cover will need to be placed over the pipe prior to hauling DCF with CAT 740 haul trucks. <br /> 7.0 PHOTOGRAPHS <br /> Av <br /> r S= <br /> A , y ► .s <br /> �• i'� tY. �`a 1.,� *��'��±�,*4' 1."5.,�''�'�"���" j♦t, 4 � ~ � <br /> April 13, 2016—Timbered Adit Encountered at Phase II Underground Working#6513 (SGR) <br /> Page 4 <br />