My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-27_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-04-27_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2020 11:53:59 PM
Creation date
5/3/2016 9:53:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
4/27/2016
Doc Name
Weekly Constructioun Quality Assurance Report - w/e 4/16/16
From
Newmont
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont Mining Corporation INN <br /> Cripple Creek&Victor Gold Mine ■ <br /> Squaw Gulch VLF CQA <br /> NewFields Job No.475.0106.006 <br /> Week Ending Saturday,April 16,2016 <br /> o M26+00 to M28+00 and K34+00 to K38+00 <br /> ➢ Fill placement (hauled from stockpile/cut) in areas bounded by bench stations: <br /> o M35+00 to M39+00 and N14+00 and N18+00 <br /> o K1+00 to K2+00 and 51+00 to 52+00 <br /> o K24+00 to K28+00 and M19+00 to M22+00 <br /> Compaction of Structural Fill was achieved using a smooth drum roller. <br /> 1.3 Subgrade <br /> Subgrade preparation was performed between stations 1-15+00 and H12+00. <br /> 1.4 Leak Detection Trench <br /> No Leak Detection activities performed during the reporting period. <br /> 1.5 Soil Liner Fill (SLF) <br /> SLF processing continued throughout the week at Dump 1. Approximately 117,309 dry tons of <br /> material has been processed as of Saturday, April 16, 2016. <br /> 1.6 Drain Cover Fill (DCF) <br /> Drain Cover Fill was placed using two low ground pressure dozers. An existing DCF haul route <br /> on the 9650 foot bench was pushed up the slope in the area below and between stations <br /> H 10+00 to H 12+00. <br /> 2.0 GEOSYNTHETICS <br /> 2.1 Geogrid <br /> Approximately 10,500 square feet of geogrid (total) was placed for the three layers of "step 3" <br /> at UG#6617. One more step will be placed before the working is considered remediated. <br /> 3.0 STORM WATER MANAGEMENT <br /> Best Management Practices continued to be performed. <br /> 4.0 NEWFIELDS LABORATORY ACTIVITIES <br /> NewFields personnel performed sieve analysis, atterberg limits, and compaction testing. One <br /> sample of Soil Liner Fill (NFSLF-I2-C) was collected from the processing plant. <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.