Laserfiche WebLink
obtained as needed from a relatively flat area east of the staging area. Soil at this location is <br /> relatively deep(over 12 inches)and removing 4 inches of topsoil would provide enough material <br /> to cover the terrace area with 2 inches of soil while leaving plenty of topsoil over the barrow <br /> area. The barrow area will be reclaimed by disking and reseeding with the same seed mix as that <br /> proposed for the terrace area. The terrace area will be reclaimed by spreading the top soil and <br /> reseeding as described in the plan. <br /> Comment 4, Exhibit F shows only Phase I mining area. <br /> Response- As we discussed on the telephone, the plan is to provide individual maps for each of <br /> the proposed phases of mining prior to the start of that phase. The operator is requesting that the <br /> reclamation bond be initially only for Phase I, and would agree to a condition of the continuance <br /> of the permit that maps and plans for Phase H and Phase M be required prior to disturbance of <br /> those areas. <br /> Please call if you have questions. $ fl <br /> Sincerely, F i a a•D <br /> �L� <br /> David R. Smuin <br /> HydroTerra-(970)242-4454 <br />