Laserfiche WebLink
Introduction <br />This document is the proposed decision of the Colorado Division of Reclamation, Mining and <br />Safety (the Division) in response to a request for a partial Phase I and partial Phase 11 bond release <br />at the Bowie No. 1 Mine, Division file number C-1981-038. The package contains four parts. <br />These include: 1) procedures and summary of the bond release process; 2) criteria and schedule for <br />bond release; 3) observations and findings of the Division regarding compliance with the bond <br />release requirements of the Colorado Surface Coal Mining and Reclamation Act and regulations <br />promulgated thereunder; and 4) the Division's proposed decision on the request for bond release. <br />Detailed information about the bond release review process can be found in the Colorado Surface <br />Coal Mining Reclamation Act (Act), the Regulations of the Colorado Mined Land Reclamation <br />Board for Coal Mining (Regulations; Rules), and in the Division's Guideline RezardinK Selected <br />Coal Mine Bond Release issues, dated April 18, 1995. All Rules referenced within this document <br />are contained within the Regulations. Detailed information about the mining and reclamation <br />operations at the Bowie No. 1 Mine can be found in the mining and reclamation permit application <br />C-1981-038 on file at the Division offices, located at 1313 Sherman Street, Room 215, in Denver, <br />Colorado. <br />The Bowie No. 1 Mine is an underground mine which is permitted and operated by Bowie <br />Resources, LLC. The ownership of the land for which bond release has been requested is federal <br />and private, and the coal ownership was federal and private. Reclamation for which bond release <br />has been requested was conducted at the West Mine from 2000 to 2002 and at the Timber Storage <br />Area in 2008. <br />