My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-26_REVISION - C1981035 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2016-04-26_REVISION - C1981035 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:21:13 PM
Creation date
4/27/2016 6:35:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
4/26/2016
Doc Name
Adequacy Review #4
From
DRMS
To
GCC Energy, LLC
Type & Sequence
TR20
Email Name
RAR
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolved Items <br />DRMS Oct 2015 (New): It is difficult on Map King 1007 to understand the relationship of the Refuse <br />final contour to the open drainage ditches. Please clarify the drawing so that this relationship is more <br />apparent. <br />The line indicating various reaches is very fine on the map. Please indicate on the map the overland <br />diversion structures and reaches in a line weight that is comparable to that indicated in the legend for <br />Map 007. <br />Resolved <br />GCCE Dec. 2015: Map King I-007 was recently reviewed by the Division as part of TR -24 <br />Adequacy Review #2. Revised map King I-007 was submitted to the Division on December 9, 2015. <br />Resolved <br />Map King I-016 shows refuse coming up against the disturbed boundary. <br />Please clarify what areas on the map will be composed of refuse. <br />GCCE Dec. 2015: Map King I-016 has been modified to clarify which areas will be composed of <br />refuse. <br />Resolved <br />Pease explain what mechanisms for overland diversion will be implemented on the south edge of the <br />refuse pile. <br />GCCE Dec. 2015: A statement has been added to Map King I-016 to explain what mechanisms for <br />overland diversion will be implemented on the south edge of the refuse pile. <br />Resolved <br />For the cross-section (Map 016A) please make all text (and especially that on the vertical and <br />horizontal scale) a legible size. <br />GCCE Dec. 2015: Map 016A text has been revised as requested. <br />Resolved <br />Also, please indicate on the map the overland diversion structure in a line weight that is comparable to <br />that indicated in the legend for "open drainage ditch ". <br />GCCE Dec. 2015: Line weights have been modified on Map King I-016 to appear comparable to <br />that indicated on the legend. <br />Resolved <br />Prepared by: R. Reilley April 2016 <br />File location: M:\ Coal\ rar\ 1MKingCoal\ TR20 Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.