Laserfiche WebLink
(Quarter 2). The inspection notes limited placement of stockpiled material since previous inspection. <br />The inspection also notes that the placement of material should be periodically tested to ensure required <br />density/compaction is achieved as per design. <br />Please provide Quarter 3 Waste pile Inspection. <br />GCCE Dec. 2015: The Quarter 3 Waste Pile Inspection has been provided to the <br />Division via email. <br />Resolved <br />Also, please provide any results of the periodic density testing results of any stockpiled material that has <br />been placed. Density testing should include test dates and results. <br />GCCE Dec. 2015: Density testing of the refuse pile was performed most recently on <br />4/2/2015 and 8/6/2015 by Trautner Geotech. These results were included with the second and third <br />quarter waste pile inspection reports, but are also attached with this submittal for your <br />convenience. <br />Resolved <br />Prepared by: R. Reilley April 2016 <br />File location: M:\ Coal\ rar\ 1MKingCoal\ TR20 Page 8 <br />