Laserfiche WebLink
Mr.Dustin Czapla <br /> Page 4 of 4 <br /> initial pilot testing of the phosphate-based in-situ treatment strategy using new <br /> piezometers installed within the Indian Rock Dump is proposed, with a treatment residual <br /> management program in place to actively control residual phosphate concentrations prior <br /> to discharge at SW-33 if needed. In addition, pilot testing of ETCs below the Tie Camp <br /> Rock Dump is proposed to develop an approach to achieving uranium load reduction <br /> while the full-scale source control strategies are being implemented. <br /> If you have any questions or require further information regarding this submittal, please <br /> contact me at (801) 244-3547. <br /> Sincerely, <br /> Bill Ferdinand <br /> Homestake Mining Company of California <br /> Director of Environment <br /> CC: R. Means- DRMS <br /> D. Davis- Homestake <br /> C. Cadwell-Homestake <br /> P. DeDycker-Arcadis <br /> File <br /> Figures <br /> Figure 1 - Location Map <br /> Figure 2 - Proposed 2016 Field Program Overview <br /> 460 West 5o North,Suite Soo,Salt Lake City,Utah 84101 TEL:(801)990-3547 <br />