My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-19_PERMIT FILE - P2016007 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2016007
>
2016-04-19_PERMIT FILE - P2016007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:56 PM
Creation date
4/22/2016 8:35:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2016007
IBM Index Class Name
Permit File
Doc Date
4/19/2016
Doc Name
Application - Form 2
From
Animas Exploration Services LLC
To
DRMS
Email Name
THM
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 (FORM 2 -Public filing) <br /> 8. Describe the estimated topsoil depth and how topsoil will be salvaged,stockpiled and redistributed for the re-establishment of <br /> vegetation. Specify approximate topsoil redistribution depth: <br /> Topsoil thickness is thin and variably developed in the areas of proposed disturbance. <br /> Rocky, C horizon soils are generally encountered within 6-12" of the ground surface. In <br /> areas with significant topsoil development, the topsoil will be stockpiled locally at the top of <br /> the road or drill pad cutbank. <br /> 9. Describe how drill holes will be plugged(refer to Rule 5.4 of the Rules for required abandonment procedures): <br /> When the drill hole is completed, it will be plugged using a sodium bentonite gel. A 10' <br /> thick cement plug will cap the top of the drill hole which will be marked with the drill hole <br /> number and date. Surface casing will be removed and if not completely removed will be <br /> from bottom to top Surface drainage will be modified to keep water from ponding in the <br /> vicinity of the drill collar. All drill collars will eventually be covered when the drill pads are <br /> reclaimed. <br /> 10. Describe how portals,adits,shafts,ponds,excavations,or other disturbances will be reclaimed(refer to Rule 3 and Rule 5 for <br /> specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br /> All drill pads will be re-contoured to match the existing topography. The surface will be left <br /> rough and where available boulders and logs will be used to minimize erosion and <br /> discourage access. The reclaimed areas will be re-seeded with approved seed mixtures <br /> annually for plant re-generation and erosion concerns until the area is released by the <br /> permitting agencies. <br /> 11. Describe how roads will be reclaimed or returned to their pre-prospecting(or better)condition: <br /> to match the existing topography. The surface will be left rough, and coarse materials <br /> (boulders/logs) where available will be used to block access and to help mitigate erosion <br /> where applicable. The disturbance will be re-seeded with an approved seed mixture for <br /> the area and monitored/t eviewed annually until tile reclamation is rel ased. <br />
The URL can be used to link to this page
Your browser does not support the video tag.