Newmont Mining Corporation <br /> Cripple Creek&Victor Gold Mine ■ <br /> Squaw Gulch VLF CQA <br /> NewFields Job No.475.0106.006 <br /> Week Ending Saturday,April 9,2016 <br /> o N14+00 to N18+00 and S40+00 to S46+00 <br /> o K36+00 to K40+00 and M30+00 to M32+00 <br /> o M16+00 to M20+00 and N0+00 to N2+00 <br /> o M20+00 to M38+00 and K20+00 to K41+50 <br /> o M16+00 to M18+00 and S24+00 to S26+00 <br /> o N20+00 to N22+00 and M40+00 to M42+00 <br /> • Slope rough grading(cut to stockpile/hauled to fill) in areas bounded by bench stations: <br /> o M16+00 to M18+00 and K22+00 to K23+00 <br /> o M22+00 to M32+00 and K30+00 to K40+00 <br /> • Fill placement (hauled from stockpile/cut) in areas bounded by bench stations: <br /> o M30+00 to M44+00 and S34+00 and S48+00 <br /> o N10+00 to N23+00 and M32+00 to M42+00 <br /> • An excavator equipped with a hammer attachment broke up oversized material to a <br /> nominal size less than 24-inches so that it could be placed as structural fill per project <br /> specifications. <br /> Compaction of Structural Fill was achieved using a smooth drum roller. <br /> 1.3 Subgrade <br /> Subgrade was accepted and approved for geogrid installation at the second "step" of UG#6617. <br /> 1.4 Leak Detection Trench <br /> Site preparation occurred in the Phase I Leak Detection area for subsequent leak detection <br /> trench excavation. <br /> 1.5 Soil Liner Fill (SLF) <br /> SLF processing continued throughout the week at Dump 1. CAT 777 haul trucks were utilized to <br /> haul SLF material from the south east side of Dump 1 to the Dump 1 Processing area. <br /> Approximately 110,936 dry tons of material has been processed as of Saturday, April 9, 2016. <br /> SLF material from Cameron stockpiles was placed in preparation for the installation of the <br /> Phase I leak detection trench. <br /> Page 3 <br />