My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-21_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2016-04-21_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:21:00 PM
Creation date
4/22/2016 6:37:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
4/21/2016
Doc Name
Adequacy Letter
From
DRMS
To
Tri-State Generation and Transmission Association, Inc
Type & Sequence
PR4
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chris Gilbreath <br />Page 2 <br />76. The response is sufficient. <br />77. It appears that well W-95-15 is marked as a surface water monitoring location on Map 10B. <br />Please explain or update Map 10B to show W-95-15 as a groundwater monitoring location. An <br />unrelated inconsistency on Map IOB is the labeling of MWC-04-33. It is shown as MWC-04- <br />33(FS,H) on the map, but Table 2.04.7-38 and Exhibit 7, Item 21, Appendix 5A suggests that it <br />should be MWC-04-33(FG,H); please clarify. <br />78. The response is sufficient. <br />79. The response was deemed sufficient in previous adequacy letters. <br />80. The response is sufficient. Per the request of CCC, Stipulation 18 has been reworded: <br />Stipulation 18: COLOWYO COAL COMPANY WILL CONSTRUCT A GROUNDWATER <br />MONITORING WELL COMPLETED IN THE TROUT CREEK SANDSTONE. <br />FOLLOWING COMPLETION OF THE WORK, A MINOR REVISION WILL BE <br />SUBMITTED TO UPDATE THE PERMIT APPLICATION PACKAGE WITH A <br />COMPLETE DESCRIPTION OF THE WELL, AND TO UPDATE TABLES 2.04.7-38,-39,-40 <br />AND -41, AND MAPS IOB AND 11C. THE REVISION WILL BE SUBMITTED NO MORE <br />THAN 90 DAYS AFTER WELL COMPLETION. THESE ACTIONS MUST BE <br />COMPLETED BEFORE ANY DISTURBANCE ASSOCIATED WITH THE COLLOM PIT <br />BOX CUT IS ALLOWED TO OCCUR. <br />81. The response was deemed sufficient in previous adequacy letters. Per the request of CCC, Stipulations <br />19 and 20 have been reworded: <br />Stipulation 19: DEWATERING WELL PERMITS MUST BE IN PLACE, AND A MINOR <br />REVISION BE SUBMITTED AND APPROVED BY THE DIVISION TO UPDATE SECTION <br />2.03.10 OF VOLUME 1 OF THE PERMIT APPLICATION PACKAGE, BEFORE ANY <br />DISTURBANCE ASSOCIATED WITH THE COLLOM PIT BOX CUT IS ALLOWED TO <br />11141KIIA <br />Stipulation 20: A DISCHARGE PERMIT FOR WATER PUMPED FROM THE <br />DEWATERING WELLS MUST BE IN PLACE, AND A MINOR REVISION TO THE <br />PERMIT SUBMITTED AND APPROVED BY THE DIVISION TO UPDATE SECTION <br />2.03.10 OF VOLUME 1 OF THE PERMIT APPLICATION PACKAGE, BEFORE ANY <br />DISTURBANCE ASSOCIATED WITH THE COLLOM PIT BOX CUT IS ALLOWED TO <br />OCCUR. <br />
The URL can be used to link to this page
Your browser does not support the video tag.