Laserfiche WebLink
would seem reasonable that the cost of installing the permanent safeguard on <br /> Portal#1 is still included in the financial warranty K&B has provided. <br /> K&B currently proposes to access only those workings that have existing <br /> access for sampling and prospecting activity. Currently, six(6) openings have <br /> existing access in safeguards. Should K&B elect to install access into any other <br /> mine openings or reopen any additional mine features, we will submit an <br /> application for modification to the current NOI or submit a new application. <br /> 6. The Applicant has stated that prospecting may include advancement of drifts <br /> and/or raises/winzes from existing underground workings subject to the total <br /> amount of material to be extracted The Division approved the Operator to remove <br /> a total of 250 cubic yards of material. Please specify the total volume of material <br /> which has been removed from the mine to date. <br /> The Operator has removed no more than 72 cubic yards of material from the mine (all <br /> areas)to date. <br /> 7. The Applicant has stated that the detached accessory structure(shed) located <br /> on the Rip Van Dam Lode and the office structure located on the Badger Claim <br /> will remain post prospecting for the use of the landowner. Please provide a <br /> signed and notarized statement from the landowner which demonstrates the <br /> landowner's desire to have these structures remain. <br /> At the request of K&B, the landowner sent the Division a notarized statement <br /> demonstrating the landowner's desire to have these structures remain post- <br /> prospecting. A copy of this affidavit is attached hereto. <br /> 8. The Applicant has stated, in an Adequacy Response letter dated February 4, <br /> 2014, that the mine working would be advanced ten feet to allow the core drill to <br /> fit into the drifts.Please specify if this advancement of the drifts has been <br /> completed. In addition, specify if the Applicant is proposing additional <br /> advancements of the mine workings under this modification application. <br /> Work has been completed in the upper level and no further advancement is <br /> proposed in that area. As indicated in the letter dated February 4, it may <br /> be necessary to perform additional work in the lower level to allow the <br /> core drill to be stationed within the existing workings. K&B does not <br /> intend to vary from the proposed and previously approved activity <br /> regarding advancement of workings. No additional development of mine <br /> workings is proposed under this modification application. <br /> DRMS NOI Mod.,Response 1 Page 16 of 17 4/18/2016 <br />