My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-15_INSPECTION - M1982200
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1982200
>
2016-04-15_INSPECTION - M1982200
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2020 11:26:37 PM
Creation date
4/19/2016 6:19:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982200
IBM Index Class Name
Inspection
Doc Date
4/15/2016
Doc Name
BLM Inspection Report
From
US Dept of the Interior
To
DRMS
Email Name
TC1
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DETAILED SITE INSPECTION OBSERVATIONS <br /> The operator does not have any active contracts with BLM for this site. In <br /> order for DRMS to extend the temporary cessation for another 5 years,the <br /> GENERAL COMPLIANCE operator must remove material before the end date of their current <br /> cessation (October 2016). All other aspects of the site are in compliance <br /> with the mining and reclamation plan on file with BLM. <br /> The site is a developed quarry with benches, a highwall, and a working <br /> SITE DEVELOPMENT floor. No developments have taken place since the quarry was last active in <br /> 2010. <br /> Q <br /> � The mine is currently in temporary cessation via CDRMS (approved January <br /> z OPERATIONAL PHASE 13, 2012). The last activity reported was October of 2010. <br /> a <br /> J <br /> zDue to its inactivity, vegetation has naturally grown over much of the site. <br /> 0 RECLAMATION STATUS The only weed species observed during the inspection was the Common <br /> Q (TOPSOIL,ROADS,ETC.) Mullein, which is a List B pioneer species. <br /> Q <br /> J <br /> ,w The site's overall basin-shaped topography prevents any sedimentation <br /> from being swept offsite.The only erosion observed during the inspection <br /> 06 LU EROSION/SEDIMENTATION was along the site's access road near the lower quarry floor. <br /> z_ <br /> No explosives are stored on site. When they are operational,the blasting is <br /> EXPLOSIVES done by Aaron Tezak.They use Unigel and Anfo when they are doing a <br /> shot. <br /> The highwalls are not marked, however access is across private land with a <br /> SAFETY locked gate.The mine is also not in operation. Therefore,this does not <br /> appear to pose a threat to safety. <br /> There do not appear to be any engineering or geologic stability issues <br /> ENGINEERING/GEOLOGIC&STABILITY currently at this site. Most of the loose material on, or near,the quarry <br /> CONDITIONS highwall has been revegetated. <br /> OTHER LOCAL/STATE/ FEDERAL REQ. & The DRMS sign was posted. There does not seem to be any compliance <br /> COMPLIANCE issues with other state and federal requirements at this time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.