within the Deadman's Creek watershed)be blocked for every blast? <br /> D-25 18. Blast Area Clearing and Firing Procedures"Audible blast signals will be utilized"... <br /> Question: How far away will this sound be heard? <br /> D-25 19. Misfire Procedures. <br /> Questions: In a normal blast, how long will Little Turkey Creek Road be blocked? In a typical misfire, how <br /> long will Little Turkey Creek Road be blocked? How frequently would misfires be expected? In a"worst <br /> case" scenario misfire,how long will Little Turkey Creek Road be blocked? <br /> D-26 20. Blast Monitoring Procedures "Seismic instrument(s)will be used to measure ground vibration and peak <br /> particle velocity" <br /> Questions: Where will these monitors be located? How many? How long will the records be retained after <br /> each blast? Will these records be available for viewing by interested landowners within Eagles Nest? <br /> D-26 21. Blast Monitoring Procedures Microphones will be used"... <br /> Question: where will these monitors be located? How many? How long will the records be retained after <br /> each blast? Will these records be available for viewing by landowners within Eagles Nest? <br /> Exhibit E E-2 22. "The surrounding land uses are Wildlife Habitat(National Forest)and agricultural to the East." <br /> Exclamation Plan Question: Why is no mention made that there are residential properties to the north and west of the <br /> ro osed quarry? <br /> E-3 23. Top Soil Preservation"Additionally, stockpiled topsoil will be seeded, following initial removal, with a seed <br /> mixture that will establish quickly and prevent topsoil loss due to wind and water erosion, as discussed <br /> below. <br /> Questions: What is the maximum time that the top soil pile will be exposed? Will the top soil pile be <br /> seeded only after all of the top soil has been removed during a particular phase of theproject? <br /> E-3 24. "...As outlined in Rule 3.1.9, Woody vegetation at the site will be removed from or appropriately <br /> incorporated in the existing topsoil prior to excavation" <br /> Question: Does that mean that the material will be chipped and added to the topsoilpile? <br /> E-3 25. "If this is not practicable,the woody vegetation will be chipped to incorporate into subsoils, or used as brush <br /> windrows for the project storm management plan". <br /> Question: When will the storm water management plan bepublished? <br /> E-3 26. "Topsoil removed from the access road corridor will be stockpiled in windrows adjacent to the access road." <br /> Question: How will dust blowing from these stockpiles of topsoil be mitigated? <br /> E-4 " 27. "Storm water will be managed throughout both mining and reclamation as discussed in Exhibit G. Storm <br /> water from all areas of disturbance will be directed into the existing sedimentation systems for the mine. <br /> After the water is clarified it will be discharged into existing drainages. A Colorado Pollutant Discharge <br /> System CDPS discharge permit will be obtained and a Storm Water Management Plan(SWMP)prepared <br /> and implemented throughout the life of the mine." <br /> Questions: When will Colorado Pollutant Discharge System CDPS discharge permit be obtained?: When <br />