My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-15_PERMIT FILE - M2016010 (8)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2016010
>
2016-04-15_PERMIT FILE - M2016010 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2021 10:36:45 AM
Creation date
4/19/2016 6:05:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016010
IBM Index Class Name
Permit File
Doc Date
4/15/2016
Doc Name
Letter of Concern
From
Nancy Reed
To
DRMS
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pit Wall walls." <br /> Geotechnical Question: This only mentions minimizing damage to final walls of the quarry; no mention is made of <br /> Assessment—Rev. impacts to off-site locations(such as property within Eagles Nest or Little Turkey Creek Road). What <br /> B/591-4 measures will be taken to assure that there is no impact to off-site locations? <br /> Hitch Rack Ranch P 17 59. "Pit slope movement monitoring should be conducted at routine time intervals with EDM/Prism surveying, <br /> Pit Wall laser scanning, and/or extensometers. It is recommended that the movement monitoring plan be developed <br /> Geotechnical during initial mining as it will be influenced by wall performance. The plan should be implemented as final <br /> Assessment—Rev. highwalls start to be developed." <br /> B/591-4 Question: Wording says"SHOULD BE CONSIDERED". Does Transit Mix, in fact, plan to perform these <br /> monitoring tasks? <br /> Hitch Rack Ranch Figure G.2 60. Figure shows the proposed design for catch berms. As designed,these will catch 99% of the rocks that fall. <br /> Pit Wall Question: Given that 1%of the rocks will NOT be caught by the berms, what protection will be added to <br /> Geotechnical ensure that rocks do not fall or roll onto the Little Turkey Creek Road at the base of the quarry pits? <br /> Assessment—Rev. <br /> B/591-4 Appendix <br /> G, Bench L-R and <br /> Rock Fall results <br />
The URL can be used to link to this page
Your browser does not support the video tag.