My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-15_INSPECTION - C1981022 (2)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981022
>
2016-04-15_INSPECTION - C1981022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2020 11:23:47 PM
Creation date
4/18/2016 6:35:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Inspection
Doc Date
4/15/2016
Doc Name
Inspection Report
From
DRMS
To
Oxbow Mining, LLC
Inspection Date
4/6/2016
Email Name
LDS
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 6,2016 C-1981-022/Elk Creek Mine LDS <br /> PROCESSING WASTE/COAL MINE WASTE PILES—Rule 4.10 and 4.11 <br /> Drainage Control; Surface Stabilization; Placement: <br /> The West Valley Fill and the II West Valley Fill were both inspected and showed no signs of instability or <br /> erosion. Both ponds were dry and there were no signs of emergent weeds. The material on top of the 11 West <br /> Valley Fill had been compacted,but not yet tested for compaction. <br /> ROADS—Rule 4.03 <br /> Construction 4.03.1(3)/4.03.2(3); Drainage 4.03.1(4)/4.03.2(4); Surfacing and Maintenance 4.03.1(5)and <br /> (6)/4.03.2(5) and(6);Reclamation 4.03.1(7)/4.03.2(7): <br /> At the mine site gravel had been used to improve the surface of the main haul road. <br /> Hubbard Creek Road was blocked at the time of the inspection. Work was in progress,presumably by <br /> Delta County,who own the road,to repair the damaged bridge. <br /> RECLAMATION SUCCESS -Rule 4.15, Rule 3: <br /> The conveyor was being dismantled with cranes at the time of the inspection, and transported off site by <br /> trucks. Some parts of the conveyor structure may prove uneconomic to dismantle(for example,the"W"), in which <br /> case they will be shot down as previously expected,and probably cut up for scrap. <br /> The demolition of the silo was still delayed,pending railroad approval. <br /> Concrete pads had been broken up at the Elk Creek fan site. <br /> DOCUMENTS RECEIVED <br /> N/A <br /> OTHER(SPECIFY) <br /> N/A <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> Number of Partial Inspection this Fiscal Year: 7 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 3 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.