My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-15_INSPECTION - C1981022 (2)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981022
>
2016-04-15_INSPECTION - C1981022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2020 11:23:47 PM
Creation date
4/18/2016 6:35:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Inspection
Doc Date
4/15/2016
Doc Name
Inspection Report
From
DRMS
To
Oxbow Mining, LLC
Inspection Date
4/6/2016
Email Name
LDS
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 6,2016 C-1981-022/Elk Creek Mine LDS <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N -Air Resource Protection R -Roads <br /> N -Availability of Records R -Reclamation Success <br /> R -Backfill&Grading N -Revegetation <br /> N -Excess Spoil and Dev. Waste N - Subsidence <br /> N -Explosives N - Slides and Other Damage <br /> N -Fish&Wildlife Y - Support Facilities On-site <br /> R -Hydrologic Balance Y - Signs and Markers <br /> R -Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br /> N -Other N - Special Categories Of Mining <br /> R -Processing Waste N -Topsoil <br /> COMMENTS <br /> This was a partial inspection by Leigh Simmons of the Division of Reclamation,Mining and Safety <br /> (Division). Doug Smith of Oxbow Mining accompanied the inspection. The weather was clear and dry. <br /> The status of the Elk Creek Mine, as far as the Division is concerned,is"Active"however no coal is being <br /> mined and the activity since the last inspection has been focused on the early stages of site reclamation. <br /> The MSHA status of the mine is"Temporarily Idled" <br /> BACKFILL and GRADING—Rule 4.14 <br /> Contemporaneous Reclamation 4.14.1; Approximate Original Contour 4.14.2; Highwall Elimination 4.14.1(2)(f); <br /> Steep Slopes 4.14.2,4.27;Handling of Acid and Toxic Materials 4.14.3; Stabilization of Rills and Gullies 4.14.6: <br /> Temporary pads had been constructed to allow for the dismantling of the conveyor. The currently <br /> approved reclamation plan specifies that the pads will be removed. It's possible that Oxbow may change the plan <br /> in the future, as business needs dictate,however this would require a revision. In the short term Oxbow plans to <br /> seed the pads. <br /> HYDROLOGIC BALANCE -Rule 4.05 <br /> Drainage Control 4.05.1,4.05.2,4.05.3; Siltation Structures 4.05.5,4.05.6; Discharge Structures 4.05.7,4.05.10; <br /> Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br /> Drainage—Acid and Toxic Materials 4.05.8;Impoundments 4.05.6,4.05.9; Stream Buffer Zones 4.05.18: <br /> Ditch maintenance was ongoing. The work to dismantle the conveyor and other facilities had temporarily <br /> impaired the surface water and sediment control system in a few spots,but not to the extent that off-site impacts <br /> would be expected. Oxbow should ensure that the site is returned to full compliance as soon as possible following <br /> the conclusion of the demolition projects. <br /> GENERAL MINE PLAN COMPLIANCE: <br /> There are no revisions in process. The mine site is being reclaimed in accordance with the plan. <br /> Number of Partial Inspection this Fiscal Year: 7 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 2 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.