My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-31_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2016-03-31_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:30 PM
Creation date
4/14/2016 9:24:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
3/31/2016
Doc Name
Adequacy Review
From
DRMS
To
Trapper Mining, Inc
Type & Sequence
TR115
Email Name
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOREHOLE SEALING WORK <br />Task description: Seal GLEV-1, GLEV-2 and GLEV-3 Wells <br />Site: Trapper Mine Permit Action: TRI 15 <br />PROJECT IDENTIFICATION <br />Task #: 004 <br />Date: 3/28/2016 <br />User: JLE <br />State: Colorado <br />County: Moffat <br />Agency or organization name: DRMS <br />UNIT COSTS <br />Permit/Job#: C1981010 <br />Abbreviation: None <br />Filename: CO10-004 <br />Borehole <br />Sealing/Item Method <br />Description <br />Diameter <br />Length <br />Quantity <br />Unit <br />Unit <br />Total Cost <br />Cost <br />GLEV-1, 0 to 39 <br />Portland cement grout - <br />6.625 <br />39 <br />39.00 <br />LF <br />$1121 <br />$437.19 <br />Feet <br />8 in. (labor, equip, <br />materials) <br />GLEV-1; 39 to <br />Portland cement grout - <br />4.5 <br />199 <br />199.00 <br />LF <br />$10.65 <br />$2,119.35 <br />238 feet <br />6 in. (labor, equip, <br />materials) <br />GLEV-2, 27 feet <br />Portland cement grout - <br />4.5 <br />27 <br />27.00 <br />LF <br />$10.65 <br />$287.55 <br />6 in. (labor, equip, <br />materials) <br />GLEV-3, 0- to 29 <br />Portland cement grout - <br />6.625 <br />29 <br />29.00 <br />LF <br />$11.21 <br />$325.09 <br />feet <br />8 in. (labor, equip, <br />materials) <br />GLEV-3, 29 to 45 <br />Portland cement grout - <br />4.5 <br />16 <br />16.00 <br />LF <br />$10.65 <br />$170.40 <br />feet <br />6 in. (labor, equip, <br />materials) <br />Plug Holes <br />PVC plug - 6 in. <br />NA <br />NA <br />3.00 <br />EA <br />$53.04 <br />$159.12 <br />diameter borehole <br />Cut Casings <br />Exposed casing removal <br />4.5 to <br />4.65 <br />4.65 <br />LF <br />$1.76 <br />$8.18 <br />- Calculate <br />6.625 <br />Circumference in Linear <br />Feet <br />Mark Holes <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$3.47 <br />$3.47 <br />location/identification <br />marker (EA, material <br />cost only) <br />Job Hours: 4.00 Total Cost: $3,510.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.