Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />March 2016 Monthly Report <br />Page 2 <br />Table 1 -March 2016 Ground Water Monitoring Well and Lysimeter Depth to Water <br />Measurements <br />Monitoring Site <br />Date <br />Depth to Water (feet) <br />M -4R <br />3/30/16 <br />0 <br />M-6 <br />3/30/16 <br />Dry <br />M-7 <br />3/30/16 <br />Dry <br />M-8 <br />3/30/16 <br />Dry <br />M-9 <br />3/30/16 <br />141.49 <br />M-10 <br />3/30/16 <br />24.82 <br />M-11 R <br />3/30/16 <br />40.18 <br />M-12 <br />3/30/16 <br />175.20 <br />M -13R <br />3/30/16 <br />126.18 <br />M-14 <br />3/30/16 <br />131.24 <br />M-15 <br />3/30/16 <br />90.28 <br />M-16 <br />3/30/16 <br />21.16 <br />M-19 <br />3/30/16 <br />24.38 <br />M-21 <br />3/30/16 <br />18.58 <br />M-22 <br />3/30/16 <br />16.99 <br />M-26 <br />3/30/16 <br />15.82 <br />M-32 <br />3/30/16 <br />43.67 <br />M-33 <br />3/30/16 <br />46.65 <br />M-34 <br />3/30/16 <br />23.73 <br />BF -4 <br />3/30/16 <br />24.88 <br />BF -6 <br />3/30/16 <br />30.88 <br />LS -1R <br />3/30/16 <br />Dry <br />LS -2R <br />3/30/16 <br />Dry <br />LS -3 <br />3/30/16 <br />Dry <br />LD -1R <br />3/30/16 <br />Dry <br />LD -2R <br />3/30/16 <br />Dry <br />LD -3 <br />3/30/16 <br />Dry <br />Table 2 — March 2016 Tailing Disposal Area Piezometer Depth to Water <br />Piezometer <br />Date Depth to Water <br />(feet) <br />Total Depth (ft) Volume of <br />Water (ft) <br />P6 <br />3/30/16 <br />Dry <br />72.46 <br />0.00 <br />P7 <br />3/30/16 <br />92.29 <br />92.50 <br />0.21 <br />P8 <br />3/30/16 <br />96.88 <br />97.51 <br />0.63 <br />P9 <br />3/30/16 <br />71.93 <br />72.30 <br />0.37 <br />