My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-12_PERMIT FILE - M1988112
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1988112
>
2016-04-12_PERMIT FILE - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 11:47:45 AM
Creation date
4/14/2016 8:17:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
PERMIT FILE
Doc Date
4/12/2016
Doc Name
March 2016 Monthly Report
From
Battle Mountain Resources, Inc.
To
DRMS
Annual Report Year
2016
Report Quarter_Month
Mar
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 06, 2016 <br />pe; <br />BATTLE MOUNTAIN RESOURCES, INC. <br />Mr. Wally Erickson <br />State of Colorado <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No.M-88-112 ✓ <br />March 2016 Monthly Report s - <br />Dear Mr. Erickson: <br />RECEIVED <br />APR 12 2016 <br />DIVISION OF RECLAMATION <br />MINING AND SAFETY <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. (BMRI), <br />San Luis Project for the month of March, 2016. <br />Surface and ground water monitoring and analysis were completed for all required sites during the month <br />per the terms and conditions of the TR -32 Quality Assurance and Quality Control (QA/QC) plan. <br />Vacuum on the tailing lysimeters was verified on March 30th, no water was present for sampling and <br />subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers and the West <br />Pit monitoring wells on March 30th. March tailing impoundment piezometer measurements identified <br />these installations were either dry or contained less than 12 inches of water as illustrated in Table 2. <br />Tables 1 and 2 below identify the depth to water measurements collected for each of the site monitoring <br />wells, piezometers and lysimeters as required by the terms and conditions of the TR -32 QA/QC plan. <br />The leak detection system was measured on March 30th. A total of 880 gallons of water was excavated <br />from the leak detection system yielding a monthly average of 30.3 gpad. The tailings pond under -drain <br />measured 42.0 gpm. <br />During the month of March, the West Pit water treatment plant operated efficiently discharging a total of <br />8,603,700 gallons (26.41 acre-feet) of water to Rito Seco Creek and a total of 427,300 gallons (1.31 acre- <br />feet) of water was transferred from the West Pit to the tailings impoundment. Seepage along Rito Seco <br />Creek remained dry during the month. <br />P.O. Box 310 • San Luis, Colorado 81152-0310 • (719) 379-0798 • Fax (719) 379-0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.