Laserfiche WebLink
Borehole Worksheet Cont'd <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.800 <br />Push gradient: <br />1.000 <br />Altitude: <br />1.000 <br />Material Weight: <br />1.438 <br />Blade type: <br />1.000 <br />Net correction: 0.7877 <br />Adjusted unit production: 350.21 LCY/hr <br />Adjusted fleet production: 350.21 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.381/LCY <br />Total job time: 1.54 Hours <br />Total job cost: $205 <br />Task # TTT <br />SHIFT/DA <br />(FND-RF) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />Page 7 of 9 <br />CIRCES Cost Estimating Software <br />