Laserfiche WebLink
Borehole Worksheet Cont'd Task # TTT <br />BULLDOZER WORK <br />Task description: Replace Topsoil on Well Clusters (TR26) <br />Site: Kin! Coal Mine Permit Action: TR26 Permit/Job#: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 504 State <br />Date: 4/7/2016 County <br />User: JLE <br />Agency or organization name <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat D6T XL <br />Horsepower: <br />185 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Colorado <br />La Plata <br />DBMS <br />MATERIAL QUANTITIES <br />Initial Volume: 539 <br />Swell factor: 1.000 <br />Loose volume: 539 LCY <br />Source of estimated volume: Depths from Section 2.04.9 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />50 feet <br />444.6 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: 0% <br />Average site altitude: 0,050 feet <br />Material weight: 1,600 lbs/LCY <br />Weight description: Top Soil <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.100 (CAT HB) <br />Dozing method: 1.000 (GEN.) <br />Visibility: 1.000 (AVG.) <br />Page 6 of 9 <br />Abbreviation: None <br />Filename: C035-504 <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$35.99 <br />NA <br />Operating Cost/Hour: <br />$58.55 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.89 <br />NA <br />Total unit Cost/Hour: $133.43 <br />Total Fleet Cost/Hour: $133.43 <br />MATERIAL QUANTITIES <br />Initial Volume: 539 <br />Swell factor: 1.000 <br />Loose volume: 539 LCY <br />Source of estimated volume: Depths from Section 2.04.9 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />50 feet <br />444.6 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: 0% <br />Average site altitude: 0,050 feet <br />Material weight: 1,600 lbs/LCY <br />Weight description: Top Soil <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.100 (CAT HB) <br />Dozing method: 1.000 (GEN.) <br />Visibility: 1.000 (AVG.) <br />Page 6 of 9 <br />Abbreviation: None <br />Filename: C035-504 <br />CIRCES Cost Estimating Software <br />