Laserfiche WebLink
TC's bond reclamation cost estimate for the CRDA Expansion takes into account the consideration that bond <br />monies have already been posted for the existing Refuse Pile, which includes the entire eastern side (approximately <br />40 acres) that will be redisturbed by the proposed CRDA Expansion. This existing bond (amount corresponding to <br />acres to be redisturbed is approximately $360K), along with the calculated bond coverage for a 50 acre area <br />(approximately $380K), addresses bonding for the initial area of disturbance, as shown on Drawing C-102 in <br />Exhibit 26C. This initial bonded area includes redisturbance of the eastern side of the existing RDA <br />(approximately 40 acres), the initial CRDA bonded disturbance area (approximately 30.3 acres), haulroad <br />disturbance (approximately 2.4 acres), stockpile and ditch disturbance (approximately 9.4 acres), stockpile access <br />corridors (0.4 acres), and a bonded buffer of approximately 7.5 acres to address any minor unplanned disturbances. <br />With a total facility life of approximately 14 to 20 years, it is anticipated that the remaining 50 acres of the total <br />CRDA expansion area of 140 acres will be bonded in two future bond increments of approximately 20-30 acres <br />each (each increment will be approximately $150K - $230K, depending on size). It is anticipated that Bond <br />Increment I will occur 3-5 years in the future, and that Bond Increment 11 will occur 7-10 years in the future. <br />Consistent with the constraints inherent in a cumulative bonding approach, TC will clearly delineate bonded areas, <br />will limit disturbance to those areas, and will work with the CDRMS to determine and maintain adequate bond <br />coverage for all activities. <br />Concerning the Fish Creek Tipple, no excess spoil or underground development waste will be generated in connection <br />with the operation. Thus, the requirements of this section and Rule 4.09 are not applicable. <br />(9) Return of Coal Mine Waste to Abandoned Workings <br />(a) Each plan shall describe the design operation and maintenance of any proposed coal <br />processing mine waste disposal facility including flow diagrams and any other necessary drawings and maps, which <br />must meet the standards of 2 10 for the approval of both the Division and the Mine Safety and Health Administration <br />in accordance with 4.11.3. <br />(b) Each plan shall describe the source and quality of waste to be stored, area to be backfilled, <br />percent of the mine void to be filled method of constructing underground retaining walls, influence of the backfilling <br />operation on active underground mine operations surface area to be supported by the backfill and the anticipated <br />Occurrence of surface effects following backfilling. <br />(c) The applicant shall describe the source of hydraulic transport medium, method of dewatering <br />the placed backfill retainment of water underground treatment of water if released to surface streams, and the effect on <br />the hydrologic regime. <br />(d) The plan shall describe each permanent monitoring well to be located in the backfilled <br />area the stratum underlving the mined coal and gradient from the backfilled area. <br />(e) The requirements of 2.05.3 shall also apply to pneumatic backfilling _• operations, except <br />where the operations are exempted by the Division from requirements specifyinydrologic monitoring. <br />TCC returns the thickener underflow generated at both Washplants I and II to the abandoned and sealed <br />underground mine workings. When Washplant I initially began operations, the thickener underflow was partially <br />dewatered using a filter -press, and this material was then combined with the coarse refuse and hauled to the Refuse <br />Pile for placement. Due to handling and placement problems, TCC modified the fine refuse handling method. and <br />began pumping the thickener underflow into the abandoned mine workings in the Eastern Mining District (EMD). <br />as opposed to mixing it with the coarse refuse for placement on the Refuse Pile. <br />With both Washplants I and II operating, the thickener underflow is typically a 15 to 25 percent solids, 300 to 550 <br />gpm slurry mixture of rock and coal fines (28 mesh x 0). Exhibit 9C, Underflow Chemical Characterization. <br />provides data on selected chemical constituents found in the thickener underflow. Tile water quality of the slurry is <br />consistent with that of typical spoils water generated at the adjacent CYCC surface mine. The slurry mixture is <br />piped to the sealed mine workings in the EMD, where the fines settle -out, and the decant water flows to a sump and <br />is recycled back to the washplants. At the full coal fines refuse discharge rate. approximately l .6MM ff of coal <br />PR15-11 2.05-97.6 02/01-16 <br />