My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-06_PERMIT FILE - C1982056 (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056
>
2016-04-06_PERMIT FILE - C1982056 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:35 PM
Creation date
4/12/2016 8:39:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
4/6/2016
Doc Name
Pages 2.05-65 to 2.05-197.3 part 2
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
northern end of the toe drain approximately 120 feet to the east, allowing the toe drain to discharge to the Area l Pit <br />rather than Sedimentation Pond D. This minor design modification will allow for use of any drainage in the mine <br />water system, and provide for better control of the water relative to mixing and water quality, while not affecting <br />the stability of the pile. Drainage from the intermediate pile benches and the surface of the pile (both during <br />construction and on completion) will be controlled by sloping benches and the pile surface away from the outslope, <br />with the benches connecting into the perimeter drains along the margins of the pile. All drainage structures will <br />route drainage to existing Pond D, which will continue to operate in compliance with applicable effluent standards. <br />Designs for drainage structures associated with the CRDA are presented in Exhibit 8EE — Coal Refuse Disposal <br />Area Expansion — Drainage Designs. <br />Similar to the existing CRDA, the CRDA Expansion is designed to accommodate both temporary (winter) <br />placement and permanent disposal of coal refuse materials generated by ongoing underground development and <br />alining operations. and operation of the TCC coal preparation facilities. The coal refuse materials to be placed in <br />the expansion area are essentially the same as the materials that have been placed in the existing CRDA, and have <br />similar physical and chemical characteristics (ie: non-toxic and non-acid, refer to Table 20A, Waste Material <br />Analyses). For the CRDA Expansion, coal refuse materials would continue to be hauled from the Foidel Creek <br />Mine Facilities Area or the potential future Sage Creel: Project Area, and placed in a controlled manner on the <br />refuse pile using either TCC's existing mobile equipment fleet or contractor equipment. Any refuse materials <br />hauled from the future Sage Creek operations and placed in the CRDA Expansion area, will be transported on <br />existing designed haulroads and the County Road (RCR27). These materials will come from the same geologic <br />units that are mined or affected at the Foidel Creek Mine, and therefore, will have similar characteristics, with little <br />or no potential to adversely affect water quality, flows or vegetation; create public health hazards; or cause <br />instability in the CRDA Expansion area. <br />Permanent placement will involve dumping the material in piles or windrows, and then spreading and compacting <br />the materials in uniform lifts of 12 -inches or less, to 90 percent of maximum dry density (AASHTO). If field <br />testing indicates that compaction requirements can be consistently met with thicker lifts, lift thickness may be <br />increased up to a maximum of 24 -inches. Proper moisture control will be important in assuring adequate <br />compaction. Compaction will be verified through regular compaction testing and documentation of compaction <br />results and proper construction in both the Construction Certification (30CFR77.214-215) and the Quarterly Refuse <br />Pile Inspection Report. In addition to regular compaction testing and monitoring of water levels, the design <br />engineer (NWCC) will inspect (and test, as appropriate) key construction activities, including: 1) Foundation <br />conditions following soil and cover material stripping; 2) Underdrain materials and construction (to be photo - <br />documented consistent with the applicable requirements of Rule 4.09.1(1 1)(c)); 3) Coal refuse materials; 4) Initial <br />and ongoing coal refuse placement (quarterly); and 5) Cover and soil material placement and revegetation. A <br />report will be prepared and submitted to the CDR -MS within two weeks following each regularly scheduled <br />quarterly inspection, and a copy will be retained at the mine site. If an inspection identifies potential hazards, TC <br />will notify the CDRMS promptly, and develop appropriate emergency protection and remediation plans. <br />Temporary refuse placement (primarily during the winter months) will involve placement of refuse materials in <br />temporary stockpile areas to avoid placement when these materials may be frozen. When prevailing weather <br />conditions warm to the point where any frozen materials are thawed, the material which has been temporarily <br />stockpiled will be re -handled, placed, and compacted, consistent with permanent placement practices. Initial <br />CRDA construction will involve placement of up to approximately 3.0 MM cubic yards of refuse material to a <br />height of approximately 100 feet. Subsequent progressive CRDA construction will result in refuse placement up ro <br />the maximum design height and capacity, with progressive soil and cover material stripping and stockpiling. and <br />extension of designed drainage structures. As CRDA construction progresses, fill areas and benches will be <br />completed and graded, and cover and soil materials will be replaced to stabilize and reclaim these areas. Both <br />cover and soil materials may either be direct handled and placed or recovered and placed from stockpile, dependent <br />on construction scheduling and equipment availability. A minimum of 4.0 feet of suitable cover (2.5 feet) and soil <br />(1.5 feet) material will be replaced on all reclaimed areas, followed by re -seeding with the Rangeland Seed Mixture <br />(Table 55). Reclaimed areas will be managed in the same way as other reclamation, with regular inspections and <br />maintenance to identify and control any excessive erosion, and spraying, as necessary, consistent with the approved <br />Weed Management Plan to control noxious weeds. <br />PR 15-1 11 2.05-97.5 02/01/16 <br />