Laserfiche WebLink
Newmont Mining Corporation <br /> Cripple Creek&Victor Gold Mine ■ <br /> Squaw Gulch VLF CQA <br /> NewFields Job No.475.0106.006 <br /> Week Ending Saturday,March 26,2016 <br /> NewFields personnel performed sieve analysis, atterberg limits, and compaction testing. <br /> 5.0 MEETINGS AND COMMUNICATIONS <br /> NewFields personnel attended the weekly Contractor Planning Meeting (March 22, 2016), <br /> Ames daily safety meetings, and NewFields daily safety meetings. <br /> NewFields personnel attended a meeting with the CC&V Projects team (March 24, 2016) to <br /> discuss the scope of work required to finish the Phase I VLF and defer the Phase II construction <br /> activities until 2019. Items discussed included Phase II surface water and erosion control plan <br /> and the need to review and update the current project specifications. <br /> 6.0 MISCELLANEOUS, ISSUES AND CONCERNS <br /> Ames filled in the erosion gullies that had formed in the Drain Cover Fill to the east of the ADR 2 <br /> Facility, between the 9450-foot and 9550-foot elevation. The DCF that had sloughed to the <br /> bottom of the slope was used to fill in the eroded areas. A NewFields representative monitored <br /> the repair activities, ensuring that no frozen material was placed and no damage was done to <br /> the existing geomembrane. A minor amount of snow was present in one of the eroded <br /> trenches. A shovel was used to remove the snow prior to the placement of the DCF. <br /> 7.0 PHOTOGRAPHS <br /> 4 <br /> •`lam '" ' ";�' " " ` » � .. <br /> ., + r t 35r di tisctgt�di � ,M tom• <br /> ala * { '",:•41 <br /> a <br /> y ` `.l9` �v°jp.fi.� <br /> • <br /> March 21,2016—Confirmatory Drilling at Phase II Anaconda Mine Complex(SR) <br /> Page 4 <br />