Laserfiche WebLink
HYDRAULIC EXCAVATOR WORK <br />Task description: Backfill geotechnical test -pits, MR295 <br />Site: Foidel Creek Mine Permit Action: MR295 Permit/Job#: C1982056 <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 3/18/2016 County: Routt <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat 307D 7'-3" Stick <br />Attachment 1: ROPS Cab <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C056-001 <br />Horsepower: <br />56 <br />Weight (MT): <br />7.23 <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Load Bucket Capacity <br />Rated Capacity: 0.20 LCY (heaped) <br />Bucket Fill Factor: 1.050 Moist loam or <br />Adjusted Capacity: 0.21 LCY <br />Job Condition Correction Factors <br />Source <br />Altitude Adj: 0.90 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.75 multiplier <br />Unadjusted Hourly Unit Production: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 Excavator Total job time <br />52.07 <br />38.89 <br />38.89 <br />Bucket Size Class: Small <br />00% -110%) 1.050 <br />Site Altitude: 6800 feet <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />14.86 <br />Unit cost: $1.783 /LCY Total job cost: $1,031 <br />Hours <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: $15.33 <br />NA <br />Operating Cost/Hour: $18.67 <br />100 <br />Operator Cost/Hour: $35.36 <br />NA <br />Total Unit Cost/Hour: $69.36 <br />Total Fleet Cost/Hour: $69.36 <br />MATERIAL QUANTITIES <br />Initial volume: 578 <br />CCY Swell factor: <br />1.000 <br />Loose volume: 578 <br />LCY <br />Source of estimated volume: <br />Division of Reclamation, Mining <br />& Safety <br />Source of estimated swell factor: <br />Cat Handbook <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty): <br />Basic Job Condition Description: <br />AVERAGE <br />Secondary Job Condition within Basic Description: <br />AVERAGE <br />Cycle Time Value: <br />0.242 minutes <br />Load Bucket Capacity <br />Rated Capacity: 0.20 LCY (heaped) <br />Bucket Fill Factor: 1.050 Moist loam or <br />Adjusted Capacity: 0.21 LCY <br />Job Condition Correction Factors <br />Source <br />Altitude Adj: 0.90 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.75 multiplier <br />Unadjusted Hourly Unit Production: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 Excavator Total job time <br />52.07 <br />38.89 <br />38.89 <br />Bucket Size Class: Small <br />00% -110%) 1.050 <br />Site Altitude: 6800 feet <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />14.86 <br />Unit cost: $1.783 /LCY Total job cost: $1,031 <br />Hours <br />CIRCES Cost Estimating Software <br />