Laserfiche WebLink
March 16, 2016 C-1981-019/Colowyo Coal Mine ZTT <br /> An <br /> ,r <br /> rt r <br /> Gulch A Pond. <br /> OTHER(SPECIFY): <br /> The broken powerline pole has been fixed. A secondary pole was installed just next to the broken pole. The old <br /> pole was then"lashed"and attached to the new pole. The new power pole combination is stable and no issues <br /> were observed with the associated disturbance related to the construction. <br /> a <br /> ,a <br /> Powerline pole. <br /> ROADS—Rule 4.03 <br /> Construction 4.03.1(3)/4.03.2(3) <br /> Drainage 4.03.1(4)/4.03.2(4) <br /> Surfacing and Maintenance4.03.1(5) and(6)/4.03.2(5)and(6) <br /> Reclamation 4.03.1(7)/4.03.2(7): <br /> The emergency light-use road constructed under MR-151 to fix the broken power line pole was inspected. Topsoil <br /> Number of Partial Inspection this Fiscal Year: 8 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 6 of 9 <br />