Laserfiche WebLink
3 (FORM 2 -Public filing) <br /> I. LOCATION MAP: Attach a USGS 7.5 minute quad, or similar map of adequate scale, which locates the prospecting <br /> site(s). <br /> J. Are prospect sites(e.g.,drill holes,trench locations,etc...)staked on the ground? Yesill No 111 <br /> K. Specify the Land Management Agency,Address and Telephone Number: <br /> L. The prospector is required to document that the NOI has been sent to the BLM or the USFS. Processing of the NOI will <br /> not begin until the prospector has submitted evidence acceptable to the Division that the NOI was sent to the BLM or <br /> USFS. Check one: <br /> Evidence of notification is attached to this NOI for BLM Land <br /> Evidence of notification is attached to this NOI for USFS Land. <br /> _Q Other proof of notice is attached to this NOI <br /> II. MAPS & DRAWINGS <br /> Accurate topographic base map showing the location of the proposed project must be submitted with this notice. The prospector <br /> may submit a U.S.G.S.7.5 minute quadrangle,or similar map of adequate scale that: <br /> 3. identifies the proposed prospecting site(s)or activity areas involving surface disturbance. Activity areas include all drill holes, <br /> mud pits,excavations,trenches,adits,shafts,tunnels,rock dumps,stockpiles,impoundments and prospecting roads,and <br /> 4. includes sufficient detail to identify and locate known prospecting features and facilities that may be affected and those that <br /> are not anticipated to be affected. This includes the location of all drill holes,mud pits,excavations,trenches,adits,shafts, <br /> tunnels,rock dumps,stockpiles,impoundments and prospecting roads. Color photographs,adequately labeled(including <br /> date,orientation and location),of the prospecting site may be used to fulfill this requirement if included with the NOI <br /> submittal. <br /> III _PROJECT DESCRIPTION <br /> 7. Mineral(s)and/or Resource(s)being Investigated: gold, silver, lead, copper, zinc <br /> 8. Estimated dates of commencement and completion: <br /> Commencement: 06/01/2016 <br /> Completion: 06/01/2017 <br /> 250 channel samples <br /> 9. Amount of material to be extracted,moved or proposed to be moved: <br /> 10. Identify the type or method of prospecting proposed and quantity(place an"X") <br /> Cuts —Pits _ Trenches <br /> hafts _—Tunnels Adits Declines <br /> it Drilling _ Fluid Drilling _ Drilling&Blasting <br />