Laserfiche WebLink
Silver Wing Mine NOl <br /> Although some site improvements are contemplated under this NOI such as removal of old "junk" from <br /> the site which will greatly improve the site appearance,Jo Grant Mining Company, Inc. is not responsible <br /> for clean-up of pre-existing site conditions. <br /> Colorado Goldfields Inc. proposes the following financial warranty amounts: <br /> 1. Portal Gate 2,500 <br /> 2. One Acre of disturbed land to be reclaimed 2,000 <br /> (this includes dressing up existing roads)at the <br /> completion of the work;and reclamation of minor <br /> undefined/unplanned disturbances that may occur) <br /> 3. 2,500 square feet of liner to cover the sediment 3,500 <br /> disposal site(installed cost) <br /> 4. 30 inches of native material to cover over liner 2,500 <br /> (placement of approx. 250 cubic yards of material <br /> that was excavated to form the repository) <br /> 5. General site clean-up 1,000 <br /> 6. Maintenance of Storm Water Management 1,500 <br /> Facilities <br /> 7. Water Quality Monitoring allocation after site closure 10,000 <br /> 8. Mobilization 2,000 <br /> Total Financial Warranty $25,000 <br /> 2 <br />