Laserfiche WebLink
Page 15 of 137 <br />Truck Bed (volume) Basis: <br />Struck Volume: <br />21.60 <br />LCY <br />Heaped Volume: <br />31.70 <br />LCY <br />Average Volume: <br />26.65 <br />LCY <br />Adjusted Volume: <br />31.70 <br />LCY <br />Adjusted for site altitude: <br />Final Truck Volume Based on Number of Loader Passes: 25.53 <br />Loading Tool Capacity <br />Truck Ownership: <br />Common ownership of trucks and loaders - <br />-0.040 <br />Bucket Size Class: NA <br />Rated Capacity: <br />9.200 <br />LCY (heaped) <br />Bucket Fill Factor: <br />0.925 <br />-0.040 <br />Loose material - 1/8" to 3/8" 90 - 95% 0.925 <br />Adjusted Capacity: <br />8.510 <br />0.000 <br />LCY <br />Job Condition Corrections: <br />Site Altitude (ft.): 6800 feet <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders – Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, 0 <br />maneuver): <br />LCY <br />3 passes <br />— minutes <br />Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Adj: <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders – Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, 0 <br />maneuver): <br />LCY <br />3 passes <br />— minutes <br />Cycle Time Factors <br />Minutes <br />Factor (min.) <br />Source <br />Material: <br />Material 1/8" to 3/4" diameter -0.02 <br />-0.020 <br />(Cat HB) <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high and up <br />0.000 <br />(Cat HB) <br />Adjusted for site altitude: <br />0.00 <br />Minutes <br />Truck Ownership: <br />Common ownership of trucks and loaders - <br />-0.040 <br />(Cat HB) <br />0.04 <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />(Cat HB) <br />Truck Cycle Time: <br />Truck Exchange Time: <br />Truck Load Time: <br />Truck Maneuver and Dump <br />Time: <br />Net Cycle Time Adjustment: <br />Adjusted Loader Cycle Time: <br />Net Load Time per Truck: <br />-0.100 minutes <br />0.475 minutes <br />1.050 minutes <br />0.60 <br />Minutes <br />Adjusted for site altitude: <br />0.600 <br />Minutes <br />1.050 <br />Minutes <br />Adjusted for site altitude: <br />1.050 <br />Minutes <br />1.00 <br />Minutes <br />Adjusted for site altitude: <br />1.000 <br />Minutes <br />CIRCES Cost Estimating Software <br />