Laserfiche WebLink
Page 14 of 137 <br />TRUCK/LOADER TEAM WORK <br />Task description: Remove Coal Stockpile Footprint <br />Site: Peabody Sage Creek Mine Permit Action: RN1-2015 Permit/Job#: C2009087 <br />PROJECT IDENTIFICATION <br />Task #: 004 State: Colorado Abbreviation: None <br />Date: 3/28/2016 County: Routt Filename: C087-004 <br />1:51:30 PM <br />User: JLE <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />DRMS <br />Truck Loader Team -Truck: Cat 770D <br />-Loader: CAT 988H <br />Support Equipment -Load Area: Cat D10T - 10SU <br />-Dump Area: Cat D10T - IOSU <br />Road Maintenance -Motor Grader: CAT 14M <br />-Water Truck:. Water Tanker, 10,000 Gal. <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team SunDort Eauinment Maintenance EauiDment <br />Total work team cost/hour: $1,789.01 <br />MATERIAL OUANTITIES <br />Initial volume: 48,400 CCY Swell factor: 1.000 <br />Loose volume: 48,400 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />95 <br />100 <br />100 <br />25 <br />25 <br />Ownership cost/hour: <br />$60.18 <br />$85.43 <br />$133.56 <br />$133.56 <br />$46.96 <br />$53.31 <br />Operating costihour: <br />$82.57 <br />$104.48 <br />$173.02 <br />$173.02 <br />$17.24 <br />$27.41 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$22.10 <br />$38.60 <br />$38.89 <br />$38.89 <br />$35.83 <br />$29.42 <br />Unit Subtotals: <br />$164.85 <br />$228.50 <br />$345.47 <br />$345.47 <br />$100.03 <br />$110.14 <br />Number of Units: <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$887.90 <br />Support: <br />$690.94 <br />Maint: <br />$210.17 <br />Total work team cost/hour: $1,789.01 <br />MATERIAL OUANTITIES <br />Initial volume: 48,400 CCY Swell factor: 1.000 <br />Loose volume: 48,400 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload(weigho Basis: <br />Material weight: <br />1,600 <br />Description: <br />Coal - <br />Rated Payload: <br />82,00( <br />Payload Capacity: <br />51.25 <br />Raw <br />Pounds/LCY <br />Pounds <br />LCY <br />CIRCES Cost Estimating Software <br />