Laserfiche WebLink
4 <br /> Hall-Irwin Corporation ' <br /> Hokestra Slurry Walls <br /> October 30, 2014 <br /> Page 6 of 8 <br /> construction staking of the southern alignment totaled 5,867 ft. The as-built alignment totaled 5,908 , <br /> ft. A difference exists of 41 feet (0.7%) between the design and as-constructed alignments. <br /> BRIERLEY , <br /> ASSOCIATES <br /> Creating Space Underground <br />