Laserfiche WebLink
Page 2 of 556 <br />036 <br />037 <br />038 <br />039 <br />040 <br />041 <br />042 <br />043 <br />044 <br />045 <br />046 <br />050 <br />051 <br />052 <br />053 <br />054 <br />060 <br />061 <br />062 <br />063 <br />064 <br />065 <br />066 <br />070 <br />071 <br />072 <br />073 <br />074 <br />075 <br />076 <br />077 <br />078 <br />079 <br />080 <br />081 <br />082 <br />083 <br />084 <br />085 <br />086 <br />090 <br />091 <br />092 <br />093 <br />Spread Uncompacted Refuse on Gob Pile #2 <br />DOZER <br />4 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />1 <br />4 <br />1 <br />4 <br />1 <br />4 <br />1 <br />4 <br />4 <br />4 <br />4 <br />1 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />1 <br />1 <br />1 <br />1 <br />89.54 <br />$123,731.00 <br />$139,198.00 <br />$2,038.00 <br />$23,377.00 <br />$300,303.00 <br />$25,423.00 <br />$1,307.00 <br />$9,460.00 <br />$104,000.00 <br />$87,599.00 <br />$117,655.00 <br />$87,945.00 <br />$9,648.00 <br />$32,884.00 <br />$19,603.00 <br />$279.00 <br />$456.00 <br />$5,473.00 <br />$3,041.00 <br />$87,070.00 <br />$11,335.00 <br />$5,473.00 <br />$159.00 <br />$172,419.00 <br />$18,281.00 <br />$3,177.00 <br />$7,630.00 <br />$4,369.00 <br />$101,119.00 <br />$36,080.00 <br />$3,493.00 <br />$7,611.00 <br />$1,091.00 <br />$2,908.00 <br />$2,479.00 <br />$309.00 <br />$645.00 <br />$1,406.00 <br />$53,715.00 <br />$119,533.00 <br />$20,163.00 <br />$2,625.00 <br />$1,074.00 <br />$7,860.00 <br />Spread Uncompacted Refuse at Gob Pile #3 <br />DOZER <br />100.73 <br />Compact Material Hauled to Gob Pile #1 <br />COMPACT <br />13.38 <br />Compact Refuse on Gob Pile #2 <br />COMPACT <br />153.51 <br />Haul refuse out of Gob Pile #2/#3 drying areas for <br />placement <br />TRUCKI <br />909.13 <br />Compact Refuse at Gob Pile #3 <br />COMPACT <br />166.94 <br />Haul Topsoil from Stockpile Area to Gob Pile #1 <br />SCRAPERI <br />2.18 <br />Place 3.5' of Coverfill on Gob Pile #1 <br />SCRAPERI <br />15.80 <br />Place Coverfill from Stockpiles on Gob Pile #2 <br />SCRAPERI <br />173.74 <br />Haul Cover Material from Gob Pile #3 to Gob Pile <br />#2 <br />TRUCKI <br />235.64 <br />Place 2.5' of Coverfill on Gob Pile #3, from <br />stockpile <br />SCRAPERI <br />196.56 <br />Compact Backfilled D -Portal Bench,Roads, & <br />Utility Corridor <br />COMPACT <br />577.52 <br />Compact Backfilled Material at Truck <br />Loadout/Coal Stockpile <br />COMPACT <br />63.35 <br />Compact Backfilled Train Loadout <br />COMPACT <br />215.94 <br />Compact B -Seam Portal Bench <br />COMPACT <br />128.72 <br />Compact Backfilled Freeman Gulch Vent Shaft <br />Pad <br />COMPACT <br />1.83 <br />Rip Utility Bench <br />RIPPER <br />0.30 <br />Rip D -Portal Bench <br />RIPPER <br />3.71 <br />Rip Truck Loadout/Coal Stockpile Area <br />RIPPER <br />2.06 <br />Rip Regraded Mine Area Prior to Topsoil <br />Replacement <br />RIPPER <br />59.09 <br />Rip Train Loadout Facilities and Railbed Benches <br />RIPPER <br />7.69 <br />Rip B -Seam Portal Bench <br />RIPPER <br />3.71 <br />Rip Rock Laydown Pad Topsoil <br />RIPPER <br />0.43 <br />Rip Haul Roads (Portion Being Reclaimed) & Old <br />Truck Loadout <br />RIPPER <br />116.47 <br />Remove Haul Road Subbase and Place on Gob Pile <br />#1 <br />SCRAPERI <br />30.54 <br />Rip Truck Loadout Road <br />RIPPER <br />2.14 <br />Haul Truck Loadout Subbase to Gob Pile #1 <br />SCRAPER1 <br />12.75 <br />Rip Upper Haul Road Asphalt Prior to Road <br />Narrowing <br />RIPPER <br />2.95 <br />Pull Back/Haul Fill Mat'l from Upper Haul Rd <br />Narrowing <br />TRUCKI <br />141.47 <br />Regrade Narrowed Section of Haul Road <br />DOZER <br />26.11 <br />Rip Gob Pile #1 Road <br />RIPPER <br />2.35 <br />Regrade Gob Pile #1 Road <br />DOZER <br />5.17 <br />Rip Access Road <br />RIPPER <br />0.73 <br />Haul Access Road Surface to Gob Pile 91 <br />SCRAPERI <br />4.86 <br />Regrade Access Road <br />DOZER <br />1.79 <br />Rip Freeman Gulch Vent Shaft Light -Use Road <br />RIPPER <br />0.20 <br />Backfill and Regrade Haul Road to Gob Pile #2 <br />DOZER <br />0.44 <br />Rip Lower Haul Road <br />RIPPER <br />0.95 <br />Regrade Lower Haul Road <br />DOZER <br />36.46 <br />Regrade Light Use Roads from MRs and TRs <br />DOZER <br />81.13 <br />Finish Grade Disturbed Mine Area <br />GRADER <br />129.92 <br />Finish Grade Train Loadout <br />GRADER <br />16.91 <br />Finish Grade B -Seam Portal Bench <br />GRADER <br />6.91 <br />Finish Grade Gob Piles #1, #2, #3, and #4 <br />GRADER <br />50.64 <br />CIRCES Cost Estimating Software <br />