My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-28_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2016-03-28_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:25 PM
Creation date
3/29/2016 7:29:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
3/28/2016
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Bowie Resources
Type & Sequence
SL1
Email Name
JDM
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Summary of Bowie No. 2 Mine Reclamation Tasks <br />Site: Bowie No. 2 Mine Permit Action: SL1 Permit/Job#: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />000 State: Colorado <br />3/28/2016 County: Delta <br />JDM <br />Agency or organization name: <br />TASK LIST (DIRECT COSTS) <br />DRMS <br />Abbreviation: <br />Filename: <br />None <br />C083-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />007 <br />008 <br />009 <br />010 <br />Oil <br />012 <br />013 <br />014 <br />015 <br />016 <br />017 <br />018 <br />019 <br />020 <br />021 <br />022 <br />023 <br />024 <br />025 <br />026 <br />027 <br />Pull back and Haul Portal Bench Fill Material to <br />Cut Slope <br />TRUCKI <br />1 <br />4 <br />2 <br />4 <br />4 <br />2 <br />4 <br />2 <br />4 <br />2 <br />4 <br />4 <br />1 <br />1 <br />4 <br />2 <br />4 <br />4 <br />4 <br />4 <br />4 <br />1 <br />4 <br />4 <br />1 <br />1 <br />1 <br />609.56 <br />$435,695.00 <br />$218,385.00 <br />$13,511.00 <br />$6,193.00 <br />$2,392.00 <br />$11,512.00 <br />$11,344.00 <br />$79,869.00 <br />$44,747.00 <br />$233,667.00 <br />$237,074.00 <br />$7,759.00 <br />$36,294.00 <br />$60,581.00 <br />$57,025.00 <br />$1,254.00 <br />$659.00 <br />$11,932.00 <br />$147,722.00 <br />$663.00 <br />$51,120.00 <br />$904.00 <br />$26,454.00 <br />$2,608.00 <br />$990.00 <br />$23,794.00 <br />$3,903.00 <br />Regrade D -Portal Bench <br />DOZER <br />158.03 <br />Pull up Material for Utility Corridor <br />EXCAVATE <br />24.96 <br />Regrade Utility Corridor <br />DOZER <br />4.48 <br />Rip and Regrade Material Storage Area at Gob Pile <br />DOZER <br />1.73 <br />Pull Back Material @ Old Truck Loadout Material <br />Storage Area <br />EXCAVATE <br />21.27 <br />Regrade Old Truck Loadout Material Storage Area <br />DOZER <br />8.21 <br />Pull Back Material at Truck Loadout/Coal <br />Stockpile <br />EXCAVATE <br />147.57 <br />Regrade New Truck Loadout and Coal Stockpile <br />DOZER <br />32.38 <br />Pull Material Back onto Train L/O Facil. and <br />Railbed Benches <br />EXCAVATE <br />431.74 <br />Regrade Train Loadout Facilities and Railbed <br />Benches <br />DOZER <br />171.56 <br />Backfill and Regrade Train L/O Overland <br />Conveyor Corridor <br />DOZER <br />5.62 <br />Haul Fill from Upper Mat'l Strge Area to B -Seam <br />Portal Bench <br />SCRAPERI <br />60.63 <br />Haul Fill fr Adj. Mat'l Storage Area to B -Seam <br />Portal Bench <br />TRUCKI <br />89.33 <br />Backfill and Regrade B -Seam Portal Bench <br />DOZER <br />38.70 <br />Pull Material Back onto Freeman Gulch Vent Shaft <br />Bench <br />EXCAVATE <br />2.31 <br />Push mat'l from Freeman Gulch Vent Shaft back to <br />Cut Slope <br />DOZER <br />0.48 <br />Regrade Freeman Gulch Vent Shaft Pad <br />DOZER <br />8.63 <br />Regrade Drill Pads from MRs and TRs <br />DOZER <br />106.90 <br />Regrade Material Storage Area from TR -29 <br />DOZER <br />0.48 <br />Backfill and Regrade New Prep Plant Bench <br />DOZER <br />36.99 <br />Replace Fill from Material Storage Area to Water <br />Tank Bench <br />SCRAPERI <br />1.51 <br />Regrade Borrow Area <br />DOZER <br />19.14 <br />Regrade Hubbard Creek Vent Shaft Pad <br />DOZER <br />1.89 <br />Regrade Upper Parking Lot Expansion Area <br />EXCAVATE <br />3.65 <br />Haul Mat'l from Bowie No. 1 Stkpl to Hubbard <br />Crk Vent Shaft <br />TRUCKI <br />26.68 <br />Haul Rock to Vent Shafts for Disposal <br />TRUCKl <br />10.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.