Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.90 Minutes <br />0.60 Minutes <br />Page 37 of 556 <br />Site Altitude: 6750 feet <br />Seg # <br />Scraper <br />Push Dozer Source <br />Roll. Res <br />(%) <br />Altitude Ad': <br />1.000 <br />NA CAT HB <br />1 <br />Job Efficiency: <br />0.830 <br />NA (CAT HB) <br />3.00 <br />2824 <br />0.52 <br />Net Correction: <br />0.830 <br />NA <br />Travel Time: <br />Road Condition: <br />Firm, smooth, rolling, <br />dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />800.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />0.52 <br />Haul Time: 0.52 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />800.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />0.40 <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 902.82 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />0.40 <br />minutes <br />2.42 <br />minutes <br />749.34 <br />LCY/Hour <br />2 <br />Scraper(s) <br />749.34 <br />LCY/Hour <br />749.34 <br />LCY/Hour <br />Fleet size: 1 Team(s) Total job time: 60.63 Hours <br />Unit cost: $0.799 /LCY Total job cost: $36,294 <br />CIRCES Cost Estimating Software <br />