My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-28_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2016-03-28_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:25 PM
Creation date
3/29/2016 7:29:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
3/28/2016
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Bowie Resources
Type & Sequence
SL1
Email Name
JDM
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 36 of 556 <br />SCRAPER TEAM WORK <br />Task description: Haul Fill from Upper Mat'l Strge Area to B -Seam Portal Bench <br />Site: Bowie No. 2 Mine Permit Action: SLI Permit/Job#: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 013 State: Colorado <br />Date: 3/2/2016 County: Delta <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Abbreviation: None <br />Filename: C083-013 <br />COSTShift basis: 1 per day <br />-Scraper: Cat 627G w/push-pull <br />-Dozer: NA <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Scraper Work Team Sunnort Eauinment Maintenance Eauipment <br />Total work team cost/hour: $598.58 <br />MATERIAL OUANTITIES <br />Initial volume: 39,000 CCY Swell factor: 1.165 <br />Loose volume: 45,435 LCY <br />Source of estimated volume: Operator Estimate, minus 14,000 cy TR79/TR84 to Gob Pile <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,900 lbs/LCY <br />Material description: Decomposed rock - 50% Rock, <br />50% Earth <br />Rated Payload: 52,800 pounds <br />Payload Capacity: 18.21 LCY <br />Scraper Bowl (volume)Basis: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$87.31 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$177.73 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$34.24 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$299.29 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$598.58 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $598.58 <br />MATERIAL OUANTITIES <br />Initial volume: 39,000 CCY Swell factor: 1.165 <br />Loose volume: 45,435 LCY <br />Source of estimated volume: Operator Estimate, minus 14,000 cy TR79/TR84 to Gob Pile <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,900 lbs/LCY <br />Material description: Decomposed rock - 50% Rock, <br />50% Earth <br />Rated Payload: 52,800 pounds <br />Payload Capacity: 18.21 LCY <br />Scraper Bowl (volume)Basis: <br />Struck Volume: <br />15.70 <br />LCY <br />Heaped Volume: <br />22.00 <br />LCY <br />Average Volume: <br />18.85 <br />LCY <br />Adjusted Capacity: <br />18.21 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.