My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-25_INSPECTION - C1981038
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981038
>
2016-03-25_INSPECTION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2020 10:44:13 PM
Creation date
3/25/2016 9:56:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Inspection
Doc Date
3/25/2016
Doc Name
Inspection Report
From
DRMS
To
Bowie Resources, LLC
Inspection Date
3/22/2016
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 22,2016 C-1981-038/Bowie No. 1 Mine JDM <br /> In addition to the maintenance item noted above,the silt-fence along the southern portion of the east mine <br /> disturbance area will require general maintenance to ensure functionality of the fence. <br /> ROADS—Rule 4.03 Construction 4.03.1(3)/4.03.2(3)Drainage 4.03.1(4)/4.03.2(4)Surfacing and Maintenance <br /> 4.03.1(5) and(6)/4.03.2(5) and(6)Reclamation 4.03.1(7)/4.03.2(7): <br /> The East Mine Haul Road has been narrowed to the current configuration. All surface drainage is directed to the <br /> roadside ditch on the uphill side of the road by water bars. The ditch flow is then directed out of the ditches and <br /> into Ditch 7, a drainage that runs parallel to the west side of the West Ridge Waste Pile, and out of the affected <br /> area west of the West Ridge Waste Pile. The East Mine Haul Road was stable with no problems noted. <br /> All roads associated with the Loadout area and the East Mine were stable and accessible during the inspection with <br /> no problems noted. <br /> SUPPORT FACILITIES-Rule 4.04: <br /> The Paonia Loadout continues to be utilized by Bowie Resources as a storage facility for mine related material <br /> from the Bowie No. 2 Mine. The Loadout was stable with no problems noted. <br /> DOCUMENTS RECEIVED-NONE <br /> OTHER(SPECIFY) -NA <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.