My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-24_INSPECTION - C1981022
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981022
>
2016-03-24_INSPECTION - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2020 10:29:11 PM
Creation date
3/25/2016 9:16:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Inspection
Doc Date
3/24/2016
Doc Name
Inspection Report
From
DRMS
To
Oxbow Mining, LLC
Inspection Date
3/16/2016
Email Name
LDS
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 16, 2016 C-1981-022/Elk Creek Mine LDS <br /> to provide surge capacity for fill material not needed on the rest of the site. <br /> ROADS—Rule 4.03 <br /> Construction 4.03.1(3)/4.03.2(3); Drainage 4.03.1(4)/4.03.2(4); Surfacing and Maintenance 4.03.1(5)and <br /> (6)/4.03.2(5) and(6); Reclamation 4.03.1(7)/4.03.2(7): <br /> The roads were in good condition around the main facilities. <br /> RECLAMATION SUCCESS -Rule 4.15,Rule 3: <br /> The two stack tubes and the end of the CV-1 belt were demolished on February 25th. Some of the scrap <br /> had already been removed and the concrete had been piled up on the pad; work was ongoing. The remaining <br /> sections of the CV-1 belt were still standing and will be removed in sections by crane (rather than simply being <br /> pulled over,as previously intended)as they had been purchased by Bronco Utah Operations. Work was in <br /> progress,using dozers,to prepare temporary pads for the cranes. The same company had also purchased the <br /> bypass belt. <br /> At the Elk Creek fan site the tank,vacuum pump building and two compressor buildings will be left <br /> standing. The substation was expected to be sold and removed.A little concrete remained to be broken up. <br /> At the portal bench,the portal building had been sold and was being dismantled. The wash bay had also been sold. <br /> Concrete remained to be broken up. <br /> Beside the highway,the silo had been completely emptied of gravel. The concrete had been drilled for <br /> explosives, and a hinge cut. Demolition was not yet scheduled-the contractors were still waiting on the necessary <br /> permits. <br /> DOCUMENTS RECEIVED <br /> N/A <br /> OTHER(SPECIFY) <br /> N/A <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 3 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.