My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-21_PERMIT FILE - M2016015
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2016015
>
2016-03-21_PERMIT FILE - M2016015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:16 PM
Creation date
3/23/2016 8:48:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016015
IBM Index Class Name
PERMIT FILE
Doc Date
3/21/2016
Doc Name
Application
From
Lucky VI Quarry
To
DRMS
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LUCKY VI QUARRY <br />MINING PLAN <br />Exhibit C <br />Amendment <br />Lucky VI Quarry lease of properties Buffalo Hunter Load and Sharp Load will commence <br />February 2016, and end February 2041. <br />Mining on the Buffalo Hunter Load and Sharp Load is expected to start spring of 2016 and end <br />in the spring of 2041. <br />The mining operation of the Lucky VI Quarry will be an intermittent operation. Also we will <br />begin reclamation of site from the start of the operation and continuously keep up reclamation <br />throughout entire process. We proposed to crush material once a year after working material <br />to make it worthwhile, working material and screening will be processed as necessary, and <br />stockpiled for use and hauling out as needed. <br />North -south access road affected land boundary will need improvements such as: widen to <br />25ft, cut ditches, and gravel. <br />Topsoil is approx. 6", suitable for plant growth and will be salvaged and along with overburden <br />stockpiled in permanent stockpiles at the edge of mining site for reuse for reclamation. <br />Permanent topsoil stockpiles will be seeded with a seed mix recommended by Custer County <br />Conservation Office (NRCS) for stability, erosion control and dust control. Operator will salvage <br />more growth medium/topsoil in areas where topsoil is deeper. <br />Temporary berms of topsoil and overburden will also be stockpiled, for safety purposes. <br />Lucky VI Quarry Phase I of mining on the Buffalo Hunter Load and Sharp Load <br />Excavate cut/slopes on Buffalo Hunter Load for safety and a workable area. Push up waste <br />rock/ overburden and crush into material to create processing area for portable screening and <br />crushing. <br />Gravel entire disturbed area to keep dust down and a decent area to work. <br />Sharp Load will be leveled up for storage for materials. It will take care of the existing cut in the <br />side of the bank. <br />Fence the entire mining area for safety( if required,) No Trespassing. Silt fence for erosion <br />control. <br />
The URL can be used to link to this page
Your browser does not support the video tag.