Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINE <br />NEWMONT MINING CO. arnec <br />SQUAW GULCH VLF WEEKLY REPORT faster <br />wheeler <br />CQA ACTIVITIES: <br />I) Field Activities; <br />The following activities were observed: Underground Working remediation; Structural Fill; and leak <br />detection. <br />II) Laboratory Activities: <br />Specific gravity, moisture content, sieve analysis, permeability testing and concrete testing. <br />General Protect Items <br />Meetings and Discussions: <br />The Weekly Contractor Meeting was held February 23, 2016 (Amec Foster Wheeler, CC&V, Ames). <br />➢ Ames daily safety meetings <br />➢ Amec Foster Wheeler daily safety meetings <br />Summary of Concerns: None. <br />CC&V: Daily updates, reporting, and scheduling occurred between CC&V Projects, Amec Foster <br />Wheeler, and Ames. <br />Deliveries: None. <br />CQA Monitor <br />Submitted by: <br />Bobby Redd, El <br />Project Resident <br />CC&V Projects <br />Reviewed By: <br />Date: February 29, 2016 <br />Date: '3/2— //A <br />Reviewed By: Date: <br />