My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-17_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-03-17_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:14 PM
Creation date
3/18/2016 8:31:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
3/17/2016
Doc Name
Weekly CQA Report - AMEC weeks ending 2/27/2016 & 2/29/2016 - NEWFIELDS week ending 3/05/2016
From
Newmont
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont Mining Corporation <br />Cripple Creek & Victor Gold Mine <br />Squaw Gulch VLF CQA <br />NewFields Job No. 475.0106.006 <br />Week Ending Saturday, March 05, 2016 <br />NM <br />• <br />o K16+00 to K24+00 and S20+00 to S26+00 <br />• Compaction with smooth drum rollers in areas bounded by bench stations: <br />o M8+00 to M12+00 and 516+00 to 524+00 <br />o Below 130+00 to 136+00 <br />D. Material was cut from the hillside using a D6 dozer. An excavator loaded the material <br />into 740 articulating haul trucks, who hauled the material to a local stockpile. Cut to <br />stockpile took place in areas bounded by the following bench stations: <br />o 110+00 to 114+00 and K6+00 to K10+00 <br />o 116+00 to 120+00 and K10+00 to K14+00 <br />D Material was cut from the hillside at stations M38+00 to M42+00 with a D6 dozer. An <br />excavator loaded the material into 740 articulating haul trucks, who hauled the material <br />to the sliver fill that was being placed below stations N12+00 to N16+00. <br />1.3 Soil Liner Fill (SLF) <br />SLF processing continued throughout the week at Dump 1. Approximately 45,000 tons of <br />material has been processed as of Saturday, March 5, 2016. No SLF was placed in the VLF. <br />2.0 GEOSYNTHETICS <br />2.1 Geogrid <br />Four rolls of geogrid were delivered to the site. NewFields personnel observed off-loading of <br />the material and took inventory of the delivery. The rolls were delivered from lots that had <br />been previously approved for use prior to delivery. <br />3.0 STORM WATER MANAGEMENT <br />Best Management Practices continued to be performed. <br />4.0 NEWFIELDS LABORATORY ACTIVITIES <br />Two samples of Soil Liner Fill (NF-SLF-1-C and NF-SLF-2-C) were collected from the processing <br />plant. The samples will be sent to the NewFields soils laboratory in Elko, Nevada for sieve <br />analysis, atterberg limits, compaction and permeability testing. <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.