My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-11_REVISION - C1982057 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982057
>
2016-03-11_REVISION - C1982057 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:01 PM
Creation date
3/11/2016 1:59:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Revision
Doc Date
3/11/2016
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Jerry Nettleton
Type & Sequence
RN6
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Permit Renewal No. 6 Task Summary <br />Site: Seneca H -W Mine Permit Action: RN6 Permit/Job#: C1982057 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 2/2/2016 County: Routt <br />User: JHB <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C057-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />010 <br />020 <br />029 <br />030 <br />035 <br />038 <br />039 <br />040 <br />041 <br />042 <br />043 <br />045 <br />050 <br />051 <br />054 <br />057 <br />058 <br />059 <br />060 <br />061 <br />069 <br />070 <br />072 <br />073 <br />074 <br />075 <br />076 <br />083 <br />Doze Adjacent South Wadge Pit Spoil Ridges <br />DOZER <br />4 <br />2 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />110.63 <br />$237,340.00 <br />$10,452.00 <br />$116,707.00 <br />$11,407.00 <br />$3,582.00 <br />$44,405.70 <br />$8,330.00 <br />$8,330.00 <br />$8,330.00 <br />$16,911.00 <br />$7,693.00 <br />$896.00 <br />$39,807.00 <br />$53,942.00 <br />$61,886.00 <br />$3,275.00 <br />$60,843.00 <br />$36,635.00 <br />$79,377.00 <br />$11,879.00 <br />$28,387.00 <br />$14,732.00 <br />$89,411.00 <br />$139,337.00 <br />$155,731.00 <br />$135,366.00 <br />$127,264.00 <br />$180,392.00 <br />Rip Facilities Area <br />RIPPER <br />9.49 <br />Grade Culvert Embankments <br />DOZER <br />54.40 <br />Grade Haul Roads to Blend <br />GRADER <br />81.60 <br />Finish Grade All Mine Areas <br />GRADER <br />25.62 <br />Post Mine Drainage <br />NA <br />125.00 <br />Regrade Pond 009 <br />DOZER <br />31.76 <br />Regrade Pond 015 <br />DOZER <br />31.76 <br />Regrade Pond 016 <br />DOZER <br />31.76 <br />Regrade Pond 016a -completed but not bond <br />released <br />DOZER <br />64.48 <br />Regrade Pond 017 <br />DOZER <br />29.33 <br />Backfill and Regrade All Ditches <br />GRADER <br />6.40 <br />Replace Topsoil from Stockpile I to Shop and <br />Explosive Site <br />SCRAPERI <br />42.25 <br />Replace Topsoil from Stockpile I to Road A <br />SCRAPERI <br />31.41 <br />Replace Topsoil from Stockpile to Haul Road I <br />SCRAPERI <br />36.04 <br />Replace Topsoil from Stockpile BB to Road A <br />SCRAPERI <br />1.91 <br />Replace Topsoil from Stockpile to Raod A <br />SCRAPERI <br />35.43 <br />Replace Topsoil from Stockpile BB to Final Pit <br />Area <br />SCRAPERI <br />21.33 <br />Replace Topsoil from Stockpile C to Final Pit Area <br />SCRAPERI <br />46.22 <br />Replace Topsoil from Stockpile FF to Final Pit <br />Area <br />SCRAPERI <br />6.92 <br />Replace Topsoil from Stockpile TT to Permanent <br />Road J <br />SCRAPERI <br />16.53 <br />Replace Topsoil from Stockpile UU to Permanent <br />Road I <br />SCRAPERI <br />8.58 <br />Replace Topsoil from Stockpile WW to Final Pit <br />Area <br />SCRAPERI <br />52.06 <br />Replace Topsoil from Stockpile XX to Final Pit <br />Area <br />SCRAPER1 <br />81.13 <br />Replace Topsoil from Stockpile YY to Haul Road <br />L <br />SCRAPER1 <br />90.68 <br />Replace Topsoil from Stockpile YY to Final Pit <br />Area <br />SCRAPER1 <br />78.82 <br />Replace Topsoil from Stockpile ZZ to Final Pit <br />Area <br />SCRAPERI <br />74.10 <br />Replace Topsoil from Stockpile AAA to Final Pit <br />Area <br />SCRAPERI <br />105.04 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.