Laserfiche WebLink
Seneca II West RN6 RCE notes: <br />Although ponds are approved as permanent the Division includes costs for reclamation until Phase III <br />release. <br />Total $4,046,578.10 <br />SI -5 total was $4,929,063.64 <br />Difference =$319,005.17 <br />• Task 046 eliminated. TR?? Stock tanks approved as permanent -$ 28,601.00 <br />• Task 118 Site Maint. Reduced maint time due to on site obs. -$ 39,572.80 <br />• Task 044: This task is eliminated. Quarterly pond reports consistently show plenty of volume <br />over 3+ years. Most of mine site has undergone Phase II bond release. Ponds have been <br />approved as permanent. -$437,728.00 <br />• Task 90a: Unit costs for SI -5 appear to have been in error. Unit cost -$194,421.87 <br />For sealing boreholes is corrected to $8.04/LF for 3-4" dia. Hole <br />Total direct cost reductions with RN6 updates: <br />Overall reduction from SI -5 to RN6: <br />-$700,323.67 <br />-$882,485.54 <br />Reduction not due to elimination or correction of reclamation tasks= -$182,161.80 <br />Indirect costs account for the $182,161.80 <br />