Laserfiche WebLink
March 3,2016 C-2010-089/New Horizon North Mine BFB <br /> TOPSOIL—Rule 4.06 <br /> Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br /> The vegetation on the east side, ahead of the highwall was mowed(photo 4). The vegetation was mowed <br /> in preparation for topsoil stripping. <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> PHOTOGRAPHS <br /> Am <br /> 71 'A?are <br /> C <br /> Photo 1 —NH 1 Water Pum Photo 2—Pond 001 Emergency Spillway <br /> ew <br /> Photo 3—Pond 2 North End Photo 4—Vegetation Mowed Before Topsoil Stripping <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 3 of 3 <br />